Skip to content
Georgia Commons
Menu

Bulloch County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 9 - MANUFACTURED HOMES / Article II - SPECIFICATIONS

Sec. 9-31. Setup standards.

About this text

  • As published by Municode, current through 2026-02-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Tiedowns. Each manufactured home shall have tie downs or other devices used to secure the manufactured home based on the requirements of the current state adopted building codes or manufacturer's installation instructions.

(b) Foundations. Foundations shall be installed in accordance with the standards set forth in the current state adopted building codes or manufacturer's installation instructions.

(c) Steps and landings. Steps and/or landings are required for all homes, at all doors, and shall be constructed to the current state adopted building codes. The handrails and landings must be in place within 30 days after the approval of the installation inspection to the manufactured home.

(d) Skirting. Skirting, unpierced except for required ventilation and access and construction of materials manufactured for such purposes, which have been approved by the building inspector, shall be installed so that it encloses the area located under the home to the ground

level. The skirting must be in place within 30 days after the approval of the installation inspection to the manufactured home.

History

The history line the source prints at the end of the section.

(Amd. of 4-5-05(2))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bulloch-county/code/9-31@2026-02-03-3b3a4e1901

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.