The county staff shall prepare a report prior to the public hearing. To the extent that the county staff has knowledge of such, the report will consider the following factors: (1) Source of title: Does Burke County own fee simple title to the road/street or merely an easement for use by public for road purposes? (2) Present use of road, street or alley: Is the present use for the general public; limited use by a small group; or for the location of public utilities? (3) Past history: What use has been made of the road/street in the last seven (7) years? (4) Potential need in the future: Is the road or street in a growth area, or have transportation studies identified the road as a potential connector or corridor that would improve the transportation network? (5) Cost involved in abandoning road/street: Are there cost considerations, including legal costs that would make the abandonment prohibitive? (6) Availability of other means of travel: Would abandonment cause an inconvenience to the general public, adjoining landowners or neighborhoods, delivery of emergency, utility, or other public services?