--- title: Butts County Code of Ordinances, Sec. 70-148. Issuance requirements; duration collection: local-codes id: local-code:butts-county/code/70-148 cite_as: Butts County, Ga., Code of Ordinances § 70-148 canonical_url: https://georgiacommons.org/counties/butts/code/70-148 md_url: https://georgiacommons.org/counties/butts/code/70-148.md text_url: https://georgiacommons.org/counties/butts/code/70-148/text source_url: https://library.municode.com/ga/butts_county/codes/code_of_ordinances date: 2026-04-13 status: active jurisdiction: county:butts jurisdiction_name: Butts County county_fips: "13035" corpus_version: local-codes-butts-county-1a118e27a844 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/butts/code/~part-ii/~chapter-70/~article-iii/~division-2.md previous: https://georgiacommons.org/counties/butts/code/70-147.md next: https://georgiacommons.org/counties/butts/code/70-149-to-70-175.md index: https://georgiacommons.org/counties/butts.md branch: code edition: As published by Municode, current through 2026-04-13 edition_date_kind: current_through source_publisher: Municode version_id: local-code:butts-county/code/70-148@2026-04-13-ff2537261f --- # Butts County Code of Ordinances, Sec. 70-148. Issuance requirements; duration > As published by Municode, current through 2026-04-13 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - OFFICIAL CODE / Chapter 70 - ROADS AND BRIDGES / Article III - UTILITY CONSTRUCTION ON PUBLIC ROADS / Division 2 - PERMIT (a) Generally. A separate permit shall be required for each construction project and involving or requiring the cutting and/or removal of or tunneling under any paved surface. Applications for such permit shall be made in writing to the board of commissioners or to its duly designated representative or agent. Such application shall include the following information: The name, address and phone number of the applicant; the identity of the road upon which construction permit is requested and the exact location thereon; a description of the nature and purpose of the construction and the method to be used in accomplishing the same; and the type or kind of utility for which the construction is proposed. All permits issued are governed by and subject to the provisions of subsections (b) and (c) of this section. (b) Work performance. (1) All utility construction permitted pursuant to this article must be performed and completed in accordance with all applicable requirements and provisions contained in certain rules and procedures promulgated and adopted by the state department of transportation and known as the "Utility Accommodation Policy and Standards, 1988," or the latest edition thereof. (2) The entire cost of any permitted utility construction pursuant to this article shall be paid by the applicant. (3) The applicant shall indemnify and hold harmless the county, its board of commissioners, the board's members, and all officers, employees or agents of the county against any and all damages, claims, demands, actions, costs and expenses of whatsoever nature, which may result from any injury to, or the death of, any persons or from the loss of, or damages to the property of any kind or nature, including the highway and highway facilities or structures, property or equipment used or owned by the county or the state or the state department of transportation, and facilities which now or may hereafter occupy the right-of-way of such highway, when such injury, death, loss or damages arises out of the construction, installation, maintenance, repair, removal, relocation, operation or use of any utility facility permitted pursuant to this article. (4) The county shall not be held responsible or liable for injury or damage that may occur to said utility facilities covered by the permit, or to any connection or connections thereto, by reason of highway maintenance, construction, repair or improvement activities on or near the permitted utility construction site. (5) The cutting and/or removal of any paved surface shall be permitted only when no reasonable alternative such as tunneling, boring, etc. is available to the applicant. When permitted, the cutting and/or removal of any paved surface shall be made in compliance with the "Utility Accommodation Policy and Standards," and the applicant shall further: a. Properly backfill and repave the highway at his expense; b. Be responsible for and pay for all construction and materials expense incurred in connection with such project and in connection with properly backfilling and repaving the surface; c. Pay and be responsible and liable for any and all expenses and costs of repair if the backfill subsides or the patched/repaired pavement fails; d. Cut or saw the paved surface in neat lines by methods approved by the board of commissioners or its duly designated representative or agent; e. Open only one-half of the paved surface at one time with the open half being completely backfilled before opening the other half; f. Promptly restore the paved surface in accordance with the specifications contained in "Utility Accommodation Policy and Standards"; and g. Clean up and properly dispose of all debris, refuse, etc., from the construction site. (6) The applicant shall employ any and all methods in performing the permitted utility construction reasonably necessary to properly protect the public from injury and the highway from damage. The applicant shall have sole responsibility for the adequacy and safety of the design and engineering of his facilities. (7) The board of commissioners or its duly designated representative or agent shall have the right to inspect the work performed pursuant to the permit and to require the applicant to promptly correct all deviations from the permit and from this article. (8) If the board of commissioners incurs any expense for correcting any deviations from the permit or from this article, the applicant shall pay and be responsible for such expenses. (9) Any contractor hired or employed by the applicant to perform the work for which the permit was granted shall agree in writing, prior to commencing the work, to perform such work in accordance with the terms of the permit and of this article; to indemnify and hold the county, its board of commissioners, such board's members, and all officers, employees or agents of the county from any injury or damage claims and from any additional expense incurred by the board of commissioners in correcting any deviations. (10) When requested in writing by the board of commissioners or its duly authorized representative or agent, the applicant and/or his contractor shall obtain and carry liability and property damage insurance in an amount to be determined by the board of commissioners or its duly authorized representative or agent and to present proof of such insurance prior to commencing the permitted work. (11) When requested in writing by the board of commissioners or its duly authorized representative or agent, the applicant and/or his contractor shall furnish a surety bond in an amount to be determined by the board of commissioners or its designated representative or agent, and no work shall be commenced until such bond is presented and approved by the board of commissioners or its agent or representative. (12) The applicant shall conduct the permitted utility construction in such a manner so that there will be a minimum of interference with or interruption of traffic upon and along the highway. The board of commissioners or its designated representative or agent is authorized to prohibit or restrict any work which may unduly interfere with traffic flow or interrupt the traffic flow during times of peak traffic flow. (13) Nothing in the permit issued or in this article shall be construed as relieving the applicant and/or its contractor from securing such other permits, licenses or other forms of approval from any other governmental agencies, utilities or railroads. (14) The applicant shall be responsible for giving appropriate notice of intended work to all landowners or utilities which might be impacted by the permitted utility construction. (c) Duration. (1) The permit shall be in effect for an indefinite period of time from and after the date issued, unless sooner revoked by mutual consent or by the board of commissioners or its designated representative or agent for the applicant's failure to abide by the terms and conditions of the permit and of this article. (2) The permit shall be deemed null and void if the permitted work is not commenced within 12 months from the date of its issuance. (3) The permit may be cancelled by the board of commissioners or by its duly designated representative or agent upon applicant's failing to comply with the terms and conditions of the permit or of this article after being given reasonable written notice of such noncompliance. ## History (Ord. of 4-3-1989, § 5.2)