The volume of flow used to compute industrial waste surcharges shall be based upon metered, estimated or prorated water consumption as shown in the records of meter reading maintained by the authority. If a person discharging waste into the public sewer system produces evidence to the authority that a significant portion of the total annual volume of water used for all purposes does not reach the public sewer system, an estimated percentage of total water consumption to be used in computing charges may be agreed upon between the authority and persons discharging industrial waste into the sewer.