Where pretreatment or flow-equalizing facilities are provided or required for any waters or wastes, they shall be maintained continuously in satisfactory and effective operation by the owner at his expense. The owner shall submit operation and laboratory data on a monthly basis to the authority. The authority or the Georgia Environmental Protection Division shall determine the proper procedures.