Skip to content
Georgia Commons
Menu

Carroll County · Code of Ordinances

Part 2 - ADMINISTRATION AND ENFORCEMENT SECTION 103 — DEPARTMENT OF PROPERTY MAINTENANCE INSPECTION / Chapter 38 - ENVIRONMENT / Article IV - POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT IN MS4 URBANIZED AREAS

Sec. 38-63. Groundwater recharge area protection.

About this text

  • As published by Municode, current through 2025-05-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Introduction. In order to provide for the health, safety and welfare of the public and a healthy economic climate within the county and surrounding communities, it is essential that the quality of the county's water resources be ensured for public use. For this reason, it is necessary to protect the subsurface water resources of the county.

(b) Establishment of a groundwater recharge area district. A groundwater recharge area district is hereby established that shall correspond to all lands within the jurisdiction of the county that are mapped as significant groundwater recharge areas by the state department of natural resources in Hydrologic Atlas 18, 1989 Edition.

(c) Determination of pollution susceptibility. Groundwater recharge areas in the county are located in low pollution susceptibility areas, based on the Georgia Pollution Susceptibility Map prepared by the state department of natural resources in Hydrologic Atlas 20, 1992 Edition.

(d) Submittal requirements. With the exception of activities identified in (3) below that are exempt from this article, any land-disturbing activity in a groundwater recharge area district shall identify the groundwater recharge area district on any submittals to the county including, but not limited to a site plan, preliminary plat, or a final plat, depending on the nature of the development.

The following information, in addition to any other requirements for site plans, preliminary plats, or final plats per the county development regulations, is required for all development within groundwater recharge areas:

(1) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.

(2) All development activities or site work conducted after site plan, preliminary plat, or final plat approval shall conform to specifications of said site plan, preliminary plat, or final plat. Significant changes to the site plan, preliminary plat, or final plat that alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in an increase in the amount of excavation, fill or removal of vegetation during construction or otherwise result in an alteration of the overall appearance of the development as proposed, can be amended only with the approval by Carroll County.

(3) The following activities are exempt from the requirements of this article:

a. Repairs to a facility that is part of a previously approved and permitted development.

b. Construction of minor structures, such as sheds or additions to single-family residences.

(e) Groundwater protection standards.

(1) New waste disposal facilities must have synthetic lines and leachate collection systems.

(2) A SCS approved liner must be provided for new agricultural waste impoundments exceeding 50 acre-feet. As a minimum, the liner shall be constructed of compacted clay having a thickness of one foot and a vertical hydraulic conductivity of less than 5 x 10-7 cm/sec or other criteria established by the natural resources conservation service.

(3) No land disposal of hazardous waste shall be permitted within any significant groundwater recharge area.

(4) For all significant groundwater recharge areas, the handling, storage and disposal of hazardous materials shall take place on an impermeable surface having spill and leak protection approved by the state department of natural resources, environmental protection division (EPD). New facilities that handle hazardous materials of the types listed in section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and in the amounts of 10,000 pounds or more on any one day, shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements and local fire code requirements.

(5) For all significant groundwater recharge areas, new above ground chemical or petroleum storage tanks larger than 660 gallons must have secondary containment of 110 percent of tank volume or 110 percent of the largest tanks in a cluster of tanks.

(6) No construction may proceed on a building or mobile home to be served by a septic tank unless the county health department first approves the proposed septic tank installations as meeting the requirements of the Georgia Department of Human Resources Manual for On-Site Sewage Management Systems (hereinafter referred to as DHR manual) and this article.

(7) Minimum lot size for new homes served by an individual septic tank/drain field system will be based on table MT-1 of the DHR manual and the criteria for protection of groundwater recharge areas, A through D. Minimum lot or space size for mobile homes served by an individual septic tank/drain field system will be based on table MT-2 of the DHR manual and the criteria for protection of groundwater recharge areas, A through D. Section M, lot sizing of the DHR manual states in the criteria for protection of groundwater area, that if a local government requires a larger lot size than that required by (2A) of the DHR manual for homes or (2B) of the DHR manual for mobile homes, the larger lot size shall be used. Section M, lot sizing of the DHR manual is included as an addendum to this article.

History

The history line the source prints at the end of the section.

(Ord. of 8-4-20(2), § 1(Exh. B))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:carroll-county/code/38-63@2025-05-06-fb8f420f70

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Carroll County Code of Ordinances, Sec. 38-63. Groundwater recharge area protection | Georgia Commons