Skip to content
Georgia Commons
Menu

Carroll County · Code of Ordinances

Part 2 - ADMINISTRATION AND ENFORCEMENT SECTION 103 — DEPARTMENT OF PROPERTY MAINTENANCE INSPECTION / Chapter 86 - SUBDIVISIONS / Article XIII - VIOLATION AND PENALTY

4.5.4. Over-crossings Advantages: They are more open and present fewer security

About this text

  • As published by Municode, current through 2025-05-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

problems.

Disadvantages: They require longer approaches to achieve the standard 5 m (17 ft) of clearance over most roadways. With an additional structural depth of 1 m (3 ft), the total rise will be 6 m (20 ft). At 5%, this requires a 120 m (400 ft) approach ramp at each end, for a total of 240 m (800 ft). This can be lessened if the road is built in a cut section.

Note: 7m (23 ft) clearance is required over railroad tracks.

Overcrossing Configurations

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:carroll-county/code/4.5.4@2025-05-06-5f53294a71

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Carroll County Code of Ordinances, 4.5.4. Over-crossings Advantages: They are more open and present fewer security | Georgia Commons