Skip to content
Georgia Commons
Menu

Carroll County · Code of Ordinances

Part 2 - ADMINISTRATION AND ENFORCEMENT SECTION 103 — DEPARTMENT OF PROPERTY MAINTENANCE INSPECTION / Chapter 74 - ROADS AND BRIDGES / Article IV - PUBLIC ROADS POLICY / Division 2 - IMPLEMENTATION AND ADMINISTRATION OF PROGRAM

Sec. 74-102. Procedure for obtaining street acceptance and maintenance under the street acceptance and maintenance ordinance.

About this text

  • As published by Municode, current through 2025-05-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Once the program is initiated, the following is the step-by-step procedure for property owner/resident to obtain acceptance and maintenance for their respective streets:

When the county manager or executive officer receives a request for acceptance and maintenance of a public street or road (as defined herein) he shall inform the person that this can be accomplished only on a petition basis and completion of the following steps:

(1) Someone, other than county personnel, must circulate a petition obtaining the signatures of all or 100 percent of the property owners, not tenant, who won all or 100 percent of the street side frontage abutting the street (road) and desiring the acceptance and maintenance. The county manager then gives (or mails) the petition form, appendix A and B to the person for circulation among the property owners.

(2) Upon receipt of the signed petition (by 100 percent of the abutting property owners) the county manager authenticates the signatures from the property records on file in the tax assessor's office. When this is completed, the county manager/executive officer will direct the county engineering department to survey the roadbed and prepare the necessary right-of-way is required drawings, and determine in which class the road should be accepted in. If additional right-of-way is required, the petitioners will be asked to complete appendix C, petition 2. Appendix C is not set out herein but is on file and available for inspection in the office of the county clerk.

(3) When the survey has been completed and the required right-of-way and classifications are completed the county manager/county engineer/board of commissioners will meet with the petitioners (or steering committee) and present and discuss this material with them. All aspects of the project will be discussed at this meeting, and if the minimum right-of-way can be obtained and if all petitioners agree to the classification, the county commissioners will act on the petition, at the next scheduled meeting.

(4) When (if) the property owners wish to upgrade the road to a higher classification the county manager will direct the petitioners to complete appendix D, petition 3.

Appendix D is not set out herein, but is on file and available for inspection in the office of the county clerk. This petition must be signed by all or 100 percent of the property owners; when (if) all signatures and agreement are obtained, then a resolution providing for the construction and the payment (or assessment) of the construction cost from the abutting property owners is prepared and forwarded to the board of commissioners of the county for their approval (see appendix D).

(5) Construction work and pavement will be scheduled on a priority basis as a part of the overall continuous work program of the respective departments.

History

The history line the source prints at the end of the section.

(Ord. of 4-11-95)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:carroll-county/code/74-102@2025-05-06-3a3eb89cfe

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.