Sec. 86-173. Culverts and piped drainage systems.
About this text
- As published by Municode, current through 2025-05-06
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Drainage improvements required. Stormwater conveyance facilities, which may include but are not limited to culverts, storm drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutters, swales, channels, and ditches, shall be provided for the protection of public right-of-ways and private properties adjoining projects sites and/or public right-of-ways.
(b) Standard specifications. Unless otherwise specifically set forth herein all of the materials, methods of construction, and workmanship for the work covered in reference to stormwater conveyance facility construction shall conform to the most recent standard specifications of the state DOT.
(c) Design criteria—General. All street and stormwater conveyance facility construction shall be performed under the direct inspection of the public works department. The subdivider/ developer shall have full responsibility for the quality and safety of the work performed. The public works department shall be notified 24 hours prior to each phase of construction.
(1) All stormwater conveyance facility design calculations shall be certified by a professional engineer currently registered in the state.
(2) Stormwater flows from drainage areas up to 25 acres in size may be calculated using the rational method. Flow from drainage areas between ten and 2,000 acres in size may be calculated using the SCS method or other approved methods. Flows for drainage areas larger than 2,000 acres must be calculated using published FEMA data or USGS regional analysis.
(3) Runoff coefficients used for pre- and postdevelopment conditions for the rational methods shall be consistent with standard engineering practices. For the SCS method the runoff curve numbers found in the "Manual for Erosion and Sediment Control in Georgia" shall be used. For any stormwater analysis, the composite "C" (rational method) or CN (SCS method) used for predeveloped conditions shall not exceed 0.3 or 66, respectively, unless approval has been obtained through the development department.
(d) Design criteria—Culverts.
(1) Culverts (structures designed to convey water from one side of a public right-of-way to the other and carry the runoff from a contributing drainage area) shall be designed to pass the peak flow associated with a 100-year storm with at least one foot of freeboard between the 100-year ponding elevation and the top of the roadway shoulder, without rising the 100-year flood elevation on upstream properties, and in accordance with the chapter 46, flood damage prevention, of the County Code of Ordinances.
(2) All pipes are to be designed for inlet and outlet control conditions. Appropriate charts and tables are to be placed on the plans.
(3) The 100-year ponding limits above the culvert shall be shown on the construction plans and on the final plat (if applicable).
(4) The minimum allowable culvert diameter shall be 18 inches.
(5) Culvert design is to be in accordance with the methods contained in the "Georgia DOT Drainage Manual for Highways," chapter 7, and shall include a thorough analysis of both inlet and outlet control structures.
(e) Piped collection systems.
(1) The design (initial pipe sizing and profile design) of piped collection systems required under subsection (a) herein shall be based upon conveyance of the peak flows associated with a 100-year storm with the hydraulic grade line being at or below the structure throat throughout the system.
(2) Based on the analysis of 100-year conditions, the preliminary design shall be revised where necessary to produce a final design for which the likelihood of dwelling flooding, major property damage, or substantial public access and/or utility interruption shall be less than one chance in 100 years.
(3) Catch basins and/or drop inlets shall be designed by the developer's engineer or registered surveyor to state highway standards and subject to final approval by the public works department. This chart may be used for street water in lieu of calculations per structure:
a. 500 feet on grades up to seven percent;
b. 400 feet on grades from seven percent to ten percent; and
c. 250 feet on grades over ten percent.
(4) Catch basins shall be spaced so that the spread in the street for a 50-year design flow shall not exceed six feet, as measured from the face of the curb. Gutter spread calculations are required if the above chart is not used.
(5) Complete flow, velocity, and hydraulic grade line computations, shall be provided for all portions of a piped collection system. Hydraulic grade lines shall be shown on the storm drainage profiles contained with the development plans for the 100-year storm.
(6) Should a bridge ever be required it must meet all state DOT and public works department standards.
(7) Inverts are required in all structures, leaving no standing water. All inverts are to be constructed of grout or concrete.
(8) All structures are to be precast concrete or brick construction in accordance with state DOT and the public works department standard details.
(9) On final plats, problem lots will require a residential drainage plan prior to obtaining a building permit. Problem lots are to be determined by the community development department. Residential drainage plans shall be drawn at one-inch equals 50 feet minimum with two-foot existing and proposed topography.
(10) Maximum continuous length of pipe shall be 300 feet.
(11) Before any traffic over a storm drain is allowed, the developer shall provide an adequate depth and width of compacted backfill to protect the structure from damage or displacement. Any debris or silt that restricts the flow through a pipe shall be removed by the developer as often as necessary to maintain drainage. All pipe structures shall be cleaned before the work is accepted. Any damage or erosion shall be repaired or corrected before final acceptance by the county.
(12) Trench construction for storm drainage pipe shall be in accordance with State Highway Standards 1030D (or most current).
(13) Storm drainage pipe shall be bedded in No. 57 gravel, if firm soil is not available.
(14) A certification of the pipe specifications for each pipe shall be required before installation.
(15) Storm drainage pipes shall be sloped so as to maintain a minimum velocity of three FPS (feet per second) so that sediment will not collect.
(16) State Highway Standard 1030D (or most current) shall be used in determining class (concrete) or gauge of pipe under-fill, method of back-filling and pipe installation.
(f) Energy dissipation—Piped systems and culvert.
(1) Energy dissipation devices, such as splash-pads, rip-rap, stilling basins, etc., shall be provided at the outlet of every culvert and piped collection system. (Please refer to the "Manual for Erosion and Sediment Control in Georgia.")
(2) Energy dissipation devices shall be located entirely within the project site, and shall not encroach upon any required buffer.
(3) When uniform, graded stone rip-rap is used for energy dissipation, ultraviolet resistant filter fabric (200-pound test) shall be used between the stone layers.
(g) Minimum pipe specifications. All corrugated galvanized pipe located within a street right-of-way, drainage easement, or detention facility shall be asphalt coated. All corrugated galvanized pipe that will carry a live stream, within a street right-of-way, drainage easement, or in a detention facility shall be either:
(1) Asphalt coated with a paved invert; or
(2) Asphalt coated with a concrete lining.
(h) Pipe length.
(1) Culverts carrying live streams shall extend to where the crown of the pipe intersects the roadway slope.
(2) Pipes that do not carry live streams shall extend at least 50 feet beyond the front building setback lines, and may be required to extend farther where necessary to provide an adequately protected building site on the property. In nonresidential subdivisions, these pipes may temporarily end at the right-of-way line, but shall be extended as part of a subsequent development permit approved for the individual site.
(i) Pipe installation.
(1) Reinforced concrete pipe, corrugated steel pipe, corrugated aluminum pipe and corrugated aluminized steel pipe shall be bedded and backfilled in the same manner.
(2) Installation, backfilling and compaction shall be done in accordance with the public works department standards.
(j) End finish.
(1) Headwalls or other end treatments are required on all culverts (except under residential driveways) and at the outlet of all piped collection systems according to public works department standards.
(2) Headwalls are to be pre-cast concrete, stone masonry with reinforced concrete footings, or poured-in-place, reinforced with concrete reinforced concrete footings.
(k) Junction boxes and catch basins. Junction boxes having access to the pipe shall be constructed to meet the requirements of the state DOT and public works department standards. All pipe junctions shall have junction boxes. Junction boxes and catch basins shall have metal manhole frames and lids for access.
(l) Other structures. Natural bottom arches and box culverts may be used in accordance with the latest standard specifications of the state DOT or county specifications.
History
(Ord. of 10-16-01, § 1; Ord. of 1-6-15, § 1)