--- title: Carroll County Code of Ordinances, Sec. 86-174. Surface drainage collection: local-codes id: local-code:carroll-county/code/86-174 cite_as: Carroll County, Ga., Code of Ordinances § 86-174 canonical_url: https://georgiacommons.org/counties/carroll/code/86-174 md_url: https://georgiacommons.org/counties/carroll/code/86-174.md text_url: https://georgiacommons.org/counties/carroll/code/86-174/text source_url: https://library.municode.com/ga/carroll_county/codes/code_of_ordinances date: 2025-05-06 status: active jurisdiction: county:carroll jurisdiction_name: Carroll County county_fips: "13045" corpus_version: local-codes-carroll-county-10cf03d91a9f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/carroll/code/~part-2/~chapter-86/~article-x.md previous: https://georgiacommons.org/counties/carroll/code/86-173.md next: https://georgiacommons.org/counties/carroll/code/86-175-to-86-180.md index: https://georgiacommons.org/counties/carroll.md branch: code edition: As published by Municode, current through 2025-05-06 edition_date_kind: current_through source_publisher: Municode version_id: local-code:carroll-county/code/86-174@2025-05-06-149e37c9d8 --- # Carroll County Code of Ordinances, Sec. 86-174. Surface drainage > As published by Municode, current through 2025-05-06 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part 2 - ADMINISTRATION AND ENFORCEMENT SECTION 103 — DEPARTMENT OF PROPERTY MAINTENANCE INSPECTION / Chapter 86 - SUBDIVISIONS / Article X - STORMWATER DETENTION REQUIREMENTS (a) Design standards. (1) All new proposed channels shall be designed to carry at least the 100-year storm with one foot of freeboard. (2) Transition channels shall be provided at the inlet and outlet ends of all culverts and pipe systems, unless otherwise provided herein. (3) The maximum flow velocity at the project site's downstream property line shall not exceed the pre-developed velocity. (4) In cases of potential erosion due to irregular channel alignment, extreme velocities, or excessive slopes, a paved ditch shall be required, unless otherwise directed by the public works department. (5) The cross-sectional shape of channels shall be as found in the "Manual for Erosion and Sediment Control in Georgia". "V" shaped cross-sections are not permitted in grassed channels. (6) If the channel will be affected by backwater from culverts, bridges, other structures or floodplains, backwater elevations shall be shown in profiles of the channel. (b) Construction standards. (1) The channel shall be shaped to the dimensions specified on the approved plans and shall be free of over-falls, gullies or other irregularities. (2) Channels in fills shall be lined. (3) Protective cover in grassed channels shall be installed as soon as the earthwork is completed. ## History (Ord. of 10-16-01, § 1; Ord. of 1-6-15, § 1)