Skip to content
Georgia Commons
Menu

Charlton County · Code of Ordinances

Part II - CODE OF ORDINANCES / Part A - GENERAL CODE OF ORDINANCES / Chapter 160 - SUBDIVISION REGULATIONS / Article II - DESIGN STANDARDS

Sec. 160-33. Lots.

About this text

  • As published by Municode, current through 2023-05-18
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All lots which shall hereafter be established within a subdivision shall comply with the following design standards:

(1) General provisions. The following general requirements shall apply to all lots hereafter established within a subdivision.

a. Orientation of lot lines. In general, side lot lines shall be at right angles to street right-of-way lines, or radial to street right-of-way curves or cul-desac turnarounds.

b. Corner lots. Corner lots for residential use shall be provided with sufficient width and depth to permit the establishment of appropriate building setback lines from both streets.

c. Double frontage lots. Double frontage lots shall only be permitted where it shall be found necessary to separate a development from major arterials or to overcome specific disadvantages to topography and orientation.

d. Minimum lot elevation. Elevations of lots within flood prone areas, as defined officially by the Federal Emergency Management Agency and the county, shall conform to the requirements established for development within the established boundaries.

e. Flag lots. Flag lots shall be permitted under the following conditions:

1. Location in new minor subdivisions and not to exceed 50 percent of the total number of created lots.

2. Located in new major subdivisions and not to exceed ten percent of the total number of created lots.

3. Where the flag lot makes it possible to better utilize irregularly shaped properties or areas with resource limitations.

4. Access strips having a minimum frontage of 25 feet on an approved public or private right-of-way.

5. Minimum lot size, excluding the area of the access strip, to be the minimum lot size requirement of the county minimum lot size

ordinance.

6. No building shall be permitted in the access strip.

7. Lot width, front, side and rear yard setback requirements of this chapter to be met on that portion of the lot excluding the access strip.

8. Where flag lots are used to eliminate and not substantially increase the number of access points to collector or arterial streets.

9. Where flag lots would front on state owned highways the proposed subdivision shall be approved by state DOT for the increase in curb cuts prior to being submitted to the county.

10. Where flag lots would front on county owned streets the proposed subdivision shall be reviewed by the county traffic safety engineer to determine if there is any potential hazard created by an increase in the number of access points on county streets.

(2) Lot width and lot area requirements. Lots hereafter established within subdivisions shall conform to the lot area and lot width requirements set forth in the following schedule, which are subject to approval by the county health department but cannot be less than the following:

Central water system and central sewage system Minimum area 10,000 square feet Central water system or central sewage system Minimum lot one-half acre Individual water system and individual Minimum lot one acre Sewage disposal system Minimum lot width shall be 100 feet where dwelling and/or septic system is located

(3) Building lines. Building setbacks shall be provided on lots and shall conform to any applicable ordinance of the county, but in no case shall be less than 25 feet from a public or private street and 15 feet from back and sides lines. Setback lines shall be shown on odd-shaped lots.

(4) Debris and waste. No cut trees, timber, debris, junk, rubbish or other waste materials of any kind shall be buried in any land, or left or deposited on any lot or street at the time of the issuance of a certificate of occupancy, expiration of the performance bond or acceptance of public improvements, which ever occurs first.

(5) Waterbodies and watercourses. If a tract being subdivided contains a waterbody, or portion thereof, lot lines shall be so drawn as to distribute the entire ownership of the waterbody among the adjacent lots. The county may approve an alternate plan whereby the ownership of and responsibility for safe maintenance of the waterbody is to be placed that it will not become a county responsibility. Where a watercourse separates the buildable area of a lot from the street by which it has access, provisions shall be made for installation of a culvert, bridge or other structure of a design approved by the county engineer.

(6) Building permits. No building permits shall be issued and no building shall be erected on any lot created following the enactment of this chapter which does not comply with the requirements established herein and unless the street giving access to the lot upon which the building is proposed to be placed has been accepted, opened as, or shall have otherwise received the status of a public street or an officially approved private recorded easement.

History

The history line the source prints at the end of the section.

(Ord. of 4-06-2006(01), § 603)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:charlton-county/code/160-33@2023-05-18-40ede33702

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Charlton County Code of Ordinances, Sec. 160-33. Lots | Georgia Commons