Sec. 160-35. Easements; stormwater management for easements.

About this text

  • As published by Municode, current through 2023-05-18
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Requirements. The following easements shall be required within subdivisions:

(1) Utility easements. A ten-foot utility easement shall be provided on both sides of street rights-of-way within a subdivision. This easement area shall only be used for underground electric, telephone and television cable lines where there is not sufficient area within the right-of-way. The easement area shall be kept free of fences, screens or other permanent structures.

(2) Drainage. Where a subdivision is traversed by a watercourse, drainage way, channel or stream, there shall be provided a drainage easement or right-of-way conforming substantially with the lines of such watercourse, and such further width or construction, or both, as will be adequate for the purpose of drainage and maintenance, taking into account possible future development of higher land in the same drainage area. No fences, screens or permanent structures shall be erected or placed on or within any drainage easement. Stormwater runoff quantities shall be calculated using the following methods:

a. For developments less than 25 acres. Rational formula. The modified runoff coefficients for the rational formula in subsection (b) of this section shall be used.

b. For developments of 25 acres or more. Soil conservation service method stormwater system design storm frequency shall be:

1. 25-year return frequency peak discharge for sizing pipes.

2. 50-year return frequency 24-hour storm for all detention ponds.

(3) Maintenance easement. Where a drainage canal is such size that it requires mechanical means for cleaning, such as a dragline, there shall be a 15-foot access easement or right-of-way on either side, or 25 feet on one side, of such canal for access purposes.

(b) Stormwater management.

(1) Every development shall provide a stormwater management plan and hydraulic/ hydrology calculations which are used to size pipes, ditches, flumes and all other stormwater conveyance structures/features. All hydrology and hydraulic computations shall be prepared, stamped and signed by a professional engineer currently registered in the state. The plan must ensure that adequate facilities are provided. The design must consider that the upstream drainage basin be fully developed in accordance with the county's current land use plan for all outfall ditches, canals and pipes which traverse through the development. The design of the stormwater system must take into consideration the affect of the runoff on downstream property and drainage ways. The hydrology analysis shall produce both pre-development and post-development runoff quantities and peak flows. The platting and layout of storm drainage pipes and culverts shall be prepared by a land surveyor or registered engineer and shall be submitted for approval by the county engineer.

(2) Stormwater retention facilities shall be required where adverse stormwater runoff related impact is expected to result from the development. In addition to the stormwater analysis conclusions, the subdivision's location within the drainage basin and the knowledge of existing or anticipated problems by the county engineer shall be factored into the necessity of a detention facility. The retention pond design shall take into account groundwater table elevations when computing storage volumes. In lieu of construction of a detention facility, the developer has the option of upgrading downstream stormwater infrastructures (pipes, etc.) to eliminate the adverse impacts.

(3) The stormwater plan shall include a drainage area map, which delineates all subareas within the subdivision, as well as any off-site subareas which impact any drainage facility within the subdivision. A condition of final plat approval shall be that a registered professional engineer shall certify that the detention pond has been built according to approved plans and specifications.

(4) If a computer program is used for detention hydrology or hydraulic calculations, including generating and routing hydrographs, the output from the program shall be summarized in the stormwater management report.

History

The history line the source prints at the end of the section.

(Ord. of 4-06-2006(01), § 605)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:charlton-county/code/160-35@2023-05-18-a6b6de555e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Charlton County Code of Ordinances, Sec. 160-35. Easements; stormwater management for easements | Georgia Commons