Before a final plat of a subdivision, other than a minor subdivision, is recorded with the clerk of the superior court of the county and title of the lots thereon are conveyed, ten prints of a final plat showing the final design of a subdivision shall be submitted to the community development department for review. Such submittal shall be made as provided in the development procedures manual. The following documentation shall accompany said final plat: (1) A completed final plat application form and checklist. (2) Bond or letter of credit in the amount prescribed by the project engineer and approved by the county engineer and community development director for the cost of completing the project improvements. (3) A copy of the submitted plat in the 11-inch by 17-inch format. Scale may be reduced as necessary to fit this format. (4) If available, a copy of the plan in computer file, DXF format. (5) Record drawings of which water and sewer system as well as storm water management facilities shall bear the seal and signature of the surveyor and engineer registered in the state. (6) Conveyances of right-of-way deeds, utility and storm drainage facilities and easements. (7) Results of tests and inspections required for construction.