If the board of commissioners should in the future decide to relocate or widen the existing road, the county reserves the right to require the utility owner to take up and relay such sections of the facility which may be necessary from an engineering standpoint. The taking up and relaying shall be at the expense of the utility owner, without regard to the type of road construction or maintenance work involved.