Skip to content
Georgia Commons
Menu

Cherokee County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 46 - SOLID WASTE / Article IV - ON-SITE SEWAGE MANAGEMENT SYSTEMS

Sec. 46-177. Approved locations (Subdivisions and mobile home parks).

About this text

  • As published by Municode, current through 2026-01-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Predevelopment review. It is recommended that developers considering subdivision or mobile home park development where public or community sewage treatment systems will not be available seek a predevelopment review by the county board of health prior to developmental improvements. Rejection or tentative approval may be obtained by submitting a boundary plat including:

(1) A vicinity map;

(2) A topographic map;

(3) A preliminary soil study conducted in compliance with the department's current manual for on-site sewage management systems.

(b) Proposals and Plans Required. The following information is required for subdivision and mobile home park proposals:

(1) A boundary plat drawn to a reasonable scale which includes:

a. A vicinity map;

b. Proposed lots and streets including lot identification, dimensions, building lines and square footage of lots;

c. A topographic map depicted in two foot intervals, provided. However, that lesser contour intervals may be approved by the county board of health if the slope is sufficiently steep;

d. A soil map and soil description based on a high intensity study conducted in compliance with the department's current manual for on-site sewage management systems;

e. The location of all present and proposed wells, water systems, water courses, flood plains, sewage systems, structures, right-of-ways, utilities, storm water drainage systems and easements on the property and within 100 feet outside the perimeter of the property; and

f. The name, registration number and seal of the preparing professional surveyor or engineer.

(2) A completed subdivision analysis record on forms provided by the department or county board of health.

(3) A copy of the following documents issued by the environmental protection division of the department of natural resources:

a. The land disturbance activity permit;

b. The letters of approval to begin construction of a public water supply system and approving the source of the water supply where a public water supply is to be utilized; and

c. The approved storm water pollution plan, where applicable.

(c) Approval required. No person may sell, offer for sale, lease, rent, begin construction or otherwise begin physical development of a lot or lots in a subdivision or mobile home park until written approval of plans for the water supply and sewage disposal has been obtained from the county board of health. This approval constitutes general acceptance of all lots not excluded for development utilizing on-site sewage management systems. (Excluded lots may receive further consideration based on additional information.)

(d) Limits on use of on-site sewage management systems for subdivision and mobile home parks. Approval of subdivisions and mobile home parks utilizing on-site sewage management systems shall not be granted:

(1) When a public or community sewage system is available within 500 feet off the subdivision or mobile home park;

(2) When soils maps, descriptions, and reports compiled by a registered soil classifier indicate that soil conditions prohibit safe development of on-site sewage management systems.

(3) Prior to receipt of a letter(s) from the environmental protection division approving the plans to construct the public water supply system and approving the source of the water supply where a public water supply system is to be utilized.

(e) Subdivision and mobile home park percolation tests. Where required for planning purposes and determination of the general absorptive capacity of soils, the number of percolation tests to be made shall be one per lot, in the area where absorption fields are to be located. Preparatory to construction of on-site sewage management systems, individual lots within the proposed development shall comply with section 290-5-26.14 of the rules for on-site sewage management systems.

(f) Subdivision and mobile home park test bores. Where required for planning purposes, test bores to determine groundwater elevations and subsurface rock formations shall be made at locations, in numbers and at depths to be determined by the department or county board of health.

(g) Subdivision site walk-over. Prior to the walk-over of the proposed subdivision land, the proposed corner property lines of each lot shall be staked and the lot number affixed to each stake. The sidelines of each lot line shall be flagged and the board of health may also require clearing of the lot lines.

(h) Construction permits. Construction permits for on-site sewage management systems shall be issued in accordance with section 290-5-26.05(1)(a) of the rules for on-site sewage management systems.

(Ord. No. 98-0-110, § 290-5-26.07, 10-13-98) Legal Authority: O.C.G.A. Sections 12-8-1, 31-2-1, 31-2-2, 31-2-4, 31-2-7, 31-3-5.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cherokee-county/code/46-177@2026-01-20-456095fcd5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cherokee County Code of Ordinances, Sec. 46-177. Approved locations (Subdivisions and mobile home parks) | Georgia Commons