(a) Minimum design and construction of distribution devices. Distribution devices shall be designed and constructed in accordance with minimum design and construction criteria established in the department's current manual for on-site sewage management systems. (b) Minimum design and construction of dosing tanks. Where required, dosing tanks shall be designed, constructed, and installed in accordance with the department's current manual for on-site sewage management systems. (Ord. No. 98-0-110, ยง 290-5-26.10, 10-13-98) Legal Authority: O.C.G.A. Sections 12-8-1, 31-2-1, 31-2-2, 31-2-4, 31-2-7.