Sizing. Sizing of on-site sewage management systems shall be determined from the department's current manual for on-site sewage management systems. The daily sewage flow may be determined by the department after due consideration of data submitted by the owner or his agent on design criteria. Calculations will be made on the basis of peak flow and not on long term averages. (Ord. No. 98-0-110, ยง 290-5-26.17, 10-13-98) Legal Authority: O.C.G.A. Sections 12-8-1, 31-2-1, 31-2-2, 31-2-4, 31-2-7.