(a) In lieu of constructing sidewalks as required in subsection 106-96(a)(1) along arterial, major collector and minor collector roadways, applicants/developers may contribute funds to construct sidewalk. If the abutting/access roadway serves as a district commission boundary the developer contribution may be split between the adjoining districts based on a proportional impact calculation. (1) Calculation contribution amounts. Contribution calculations will be based upon a site specific, project cost calculation of the linear distance that would otherwise be constructed. Alternatively, the developer may submit an estimate for the construction cost to be reviewed and approved by the county department of transportation. (2) Except where specified by site-specific zoning stipulation, the final contribution amounts are subject to review and approval by the director of the Cobb County department of transportation, or his/her designee. (b) This article may also refer to other roadway improvements required from developers as a result of new development that must be coordinated with the county. These roadway improvements include but are not limited to the following: traffic signal installation and upgrades, reconstructing roadways to county design standards, constructing auxiliary turn lanes, installation of curb and gutter, and installation of traffic calming measures. Developer contributions for other roadway improvements are to be based upon a site-specific project cost estimation approved by the county department of transportation. Monetary contributions may be accepted in lieu of construction when Cobb DOT determines that having the public agency manage the improvement installation is in the best interest of the county and the travelling public. (c) Contribution management. The developer contribution will be managed by the Cobb County department of transportation. In the case of sidewalk and/or curb and gutter contributions, a biannual report shall be submitted to the county manager showing amounts collected, amounts spent, and the sidewalk projects enhanced per these funds. When selecting sidewalk projects using these funds, the county department of transportation shall coordinate with the district commissioner. The report will be made available to the board of commissioners upon their request. In the case of other roadway improvements, these funds will be placed in escrow and applied toward the specified project only, as may be detailed in the associated developer agreement between the county and the developer.