(a) Easements shall be cleaned and opened at the time of development to control surface water runoffs. Runoff slope and side slopes shall be specified by the developer's engineer, according to good engineering practice. (b) Permanent sanitary sewer easements of 20 feet in width shall be provided for necessary lines. (c) No permanent structures shall be constructed within ten feet of the edge of a permanent water or sanitary sewer easement on front and rear setbacks, or within two feet on side setbacks. The water system director may grant a variance to this requirement provided that it can be demonstrated to his or her reasonable satisfaction that such structure will not impede future installation or maintenance within said easement. (d) Easements for sanitary sewers and drainage purposes shall not overlap unless approved by the county water system. (e) Drainage easements shall be provided where the project is traversed by a watercourse, drainageway, natural stream or channel. It shall conform substantially to the limits of such watercourse plus any additional width as is necessary to accommodate future construction as recommended by the director. (f) Drainage easements within the project and off the dedicated street right-of-way shall be clearly defined on the final plat of the project. The owners of the property shall be required to keep the easement open and free of undue obstructions at all times. (g) All easements shall be cleared of debris, excess dirt and other materials. The ground shall be smoothed down and grassed within ten days of completing construction work. The use of sediment control measures may be required to protect the area until a vegetative cover is obtained.