(a) Easements shall be cleared and opened at the time of development to control surface water runoffs. Runoffs slope and side slopes shall be specified by the developer's engineer, according to good engineering practices. Drainage ditches shall conform to standard swale ditch, as specified in the standard design specifications. (b) Permanent sanitary sewer easements of 20 feet in width shall be provided for necessary lines. (c) No permanent structures shall be constructed within ten feet of the edge of a permanent water or sanitary sewer easement on front and rear setbacks, or within two feet on side setbacks. The water system director may grant a variance to this requirement provided that it can be demonstrated to his or her reasonable satisfaction that such structure will not impede future installation or maintenance within said easement. (d) Easements for sanitary sewers and drainage purposes shall not overlap unless approved by the county water system. (e) Drainage easements shall be provided where a subdivision is traversed by a watercourse, drainageway, natural stream or channel. It shall conform substantially to the limits of such watercourse plus any additional width as is necessary to accommodate future construction as recommended by the director. (f) Drainage easements off the street right-of-way shall be clearly defined on the plat and deed of the individual property owner, and property owner will be required to keep such easements free of obstructions and will maintain the easements in such a way as to assure free and maximum flow at all times. (g) All easements shall be cleared of debris, excess dirt and other materials. The ground shall be smoothed down and grassed within ten days of completing construction work. The use of sediment control measures may be required to protect the area until a vegetative cover is obtained.