Skip to content
Georgia Commons
Menu

Cobb County · Code of Ordinances

Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 122 - UTILITIES / Article II - WATER AND WASTEWATER SYSTEMS / Division 4 - CONSTRUCTION STANDARDS

Sec. 122-112. Application for connection permit.

About this text

  • As published by Municode, current through 2025-11-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) The owner of the land upon which a water or wastewater connection is desired, or his agent, shall make application on a special form furnished by the county. The permit application shall be supplemented by the owner's drawings, plans, specifications or other such information which, in the judgement of the department manager, is considered to be pertinent to the desired connection. Water and wastewater connection service charges shall be paid as stipulated in sections 122-82 and 122-83.

(b) All costs and expenses incidental to the connection shall be borne by the owner. The owner shall indemnify the county against any loss or damage to

the county water or wastewater facilities that may be directly or indirectly occasioned by the connection.

History

The history line the source prints at the end of the section.

(Ord. of 6-28-88, § 3-26-42)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cobb-county/code/122-112@2025-11-20-d8c21c8c41

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.