--- title: Cobb County Code of Ordinances, Sec. 122-119. Water and wastewater connections collection: local-codes id: local-code:cobb-county/code/122-119 cite_as: Cobb County, Ga., Code of Ordinances § 122-119 canonical_url: https://georgiacommons.org/counties/cobb/code/122-119 md_url: https://georgiacommons.org/counties/cobb/code/122-119.md text_url: https://georgiacommons.org/counties/cobb/code/122-119/text source_url: https://library.municode.com/ga/cobb_county/codes/code_of_ordinances date: 2025-11-20 status: active jurisdiction: county:cobb jurisdiction_name: Cobb County county_fips: "13067" corpus_version: local-codes-cobb-county-24105329f0b5 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/cobb/code/~part-i/~chapter-122/~article-ii/~division-4.md previous: https://georgiacommons.org/counties/cobb/code/122-118.md next: https://georgiacommons.org/counties/cobb/code/122-120.md index: https://georgiacommons.org/counties/cobb.md branch: code edition: As published by Municode, current through 2025-11-20 edition_date_kind: current_through source_publisher: Municode version_id: local-code:cobb-county/code/122-119@2025-11-20-65950d6d28 --- # Cobb County Code of Ordinances, Sec. 122-119. Water and wastewater connections > As published by Municode, current through 2025-11-20 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 122 - UTILITIES / Article II - WATER AND WASTEWATER SYSTEMS / Division 4 - CONSTRUCTION STANDARDS (a) Construction procedures. (1) All water and wastewater connections that might impact public roadways shall be carefully evaluated to identify means available to minimize impacts to existing pavement; (2) No pavement cut of a Cobb County road shall occur without permit from the county department of transportation. (3) All road cuts and restorations shall be performed in compliance with applicable provisions of the Development Standards of Cobb County. (b) Inspection of connections by county. The applicant for a building sewer connection permit shall notify the department director or his representative when the building sewer is ready for inspection and connection to the county wastewater system. The connection and testing shall be made in the presence of the department director or his representative. (c) Guarding excavations. All excavations for building sewer installation shall be adequately guarded with barricades and lights in compliance with all OSHA and state department of transportation requirements so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored to substantially the same condition as prior to the disturbance in a manner satisfactory to the county. ## History (Ord. of 6-28-88, § 3-26-49; Ord. of 2-27-07; Amd. of 2-9-21)