Cobb County · Code of Ordinances
Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 122 - UTILITIES / Article II - WATER AND WASTEWATER SYSTEMS / Division 4 - CONSTRUCTION STANDARDS
Sec. 122-123. Limitation on construction of permanent structures near water or wastewater easements.
About this text
- As published by Municode, current through 2025-11-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
No permanent structures shall be constructed within ten feet of the edge of a permanent water or wastewater easement on front and rear setbacks, or within two feet on side setbacks. The department director may grant a variance to this requirement provided that it can be demonstrated to his or her reasonable satisfaction that such structure will not impede future installation or maintenance within said easement.
History
(Ord. of 6-28-88, § 3-26-53; Amd. of 2-24-09)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.