(a) For new residential subdivisions that can be connected, regardless of distance or easements required, to active sewer by gravity sewer with an engineered design acceptable to the county water system and the county does not plan to construct additional sewers downstream of the subject property, then the property owner or developer shall comply with one of the following: (1) An active sewer by gravity to serve the ground level floor of the dwelling shall be provided to all lots smaller than 80,000 square feet. (2) Septic tanks may be utilized on lots of at least 80,000 square feet with the approval of the health department. (3) The county may consider development of a private developer agreement or special sewer availability area. (b) For new residential subdivisions that can be connected to active sewer by gravity sewer and the county plans to construct additional sewers downstream of the subject property, then a property owner or developer shall comply with one of the following: (1) Dry sewers, constructed in accordance with the county water system policy, shall be provided to all lots smaller than 80,000 square feet which are not provided with an active sewer. In all areas where dry sewers are required by this section, septic tanks shall also be provided. Approval of lot sizes and septic tank suitability must be obtained from the health department. (2) Septic tanks may be utilized on lots of at least 80,000 square feet with the approval of the health department. (3) The county may consider development of a private developer agreement or special sewer availability area. (c) For new residential subdivisions that cannot be connected to active sewer by gravity with an engineered design acceptable to the county water system and the county does not plan to construct additional sewers downstream of the subject property, septic tanks may be utilized with the approval of the health department. Lot sizes shall meet health department requirements. (d) For new nonresidential developments that can be connected, regardless of distance or easements required, to active sewer by gravity with an engineered design acceptable to the county water system, an active sewer by gravity shall be extended by the property owner and/or developer to serve the development. (e) For new nonresidential developments that cannot be connected to active sewer by gravity, the development must be eligible for and receive approval from both the county and the health department for the use of a septic system. Generally, the county will require that the property be at least 80,000 square feet and that the anticipated wastewater generation for the site is no more than one equivalent residential unit per 80,000 square feet. (f) Septic tanks shall be constructed and operated in accordance with the provisions of section 122-242.