--- title: Cobb County Code of Ordinances, Sec. 18-359. Blasting permit application requirements collection: local-codes id: local-code:cobb-county/code/18-359 cite_as: Cobb County, Ga., Code of Ordinances § 18-359 canonical_url: https://georgiacommons.org/counties/cobb/code/18-359 md_url: https://georgiacommons.org/counties/cobb/code/18-359.md text_url: https://georgiacommons.org/counties/cobb/code/18-359/text source_url: https://library.municode.com/ga/cobb_county/codes/code_of_ordinances date: 2025-11-20 status: active jurisdiction: county:cobb jurisdiction_name: Cobb County county_fips: "13067" corpus_version: local-codes-cobb-county-24105329f0b5 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/cobb/code/~part-i/~chapter-18/~article-xiii.md previous: https://georgiacommons.org/counties/cobb/code/18-358.md next: https://georgiacommons.org/counties/cobb/code/18-360.md index: https://georgiacommons.org/counties/cobb.md branch: code edition: As published by Municode, current through 2025-11-20 edition_date_kind: current_through source_publisher: Municode version_id: local-code:cobb-county/code/18-359@2025-11-20-119080d0c1 --- # Cobb County Code of Ordinances, Sec. 18-359. Blasting permit application requirements > As published by Municode, current through 2025-11-20 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 18 - BUILDING REGULATIONS / Article XIII - DEVELOPMENT BLASTING (a) Application. Only a state registered user with a "Blaster Certification Card" as required by Chapter 120-3-10 of the Rules and Regulations of the Safety Fire Commissioner of Georgia and O.C.G.A. §§ 25-2-4, 25-2-17 and 25-8-9 may apply for a blasting permit. The application must include the following: (1) Name, address and contact information for the following individuals: a. User (the permit applicant); b. Blaster; c. Developer; d. Property owner; e. Engineer creating or corroborating the blasting plan f. Seismograph operator; and g. Person to conduct pre-blast and postblast surveys. (2) State registrations for the user and blaster responsible for proposed activity, including "Blaster Certification Card" as required by Chapter 120-3-10 of the Rules and Regulations of the Safety Fire Commissioner of Georgia and per O.C.G.A. §§ 25-2-4, 25-2-17 and 25-8-9. (3) A sketch of the proposed blasting site/project superimposed over an aerial, showing measured distances from all structures, buildings, streets, above and below ground utilities, wells and other facilities within 1,000 feet of the blasting site. (4) Traffic control, barricading and sign plan (which may include hiring off-duty public safety personnel). (5) Other information deemed necessary or appropriate by the director, which may include, but is not limited to: a. Pre-blast assessment, prepared by a geotechnical engineer or other blasting professional, which assesses the geology of the blast site and surrounding area out to 2,000 feet and the potential for damage to structures and facilities within 2,000 feet of the blast site; b. Pre-blast inspection of structures and facilities located near the proposed blast location (including videotaping of structures); c. Bond to protect county facilities; d. Hydrological study; e. Geological study; and f. Test wells. (b) Fees. The established fees for blasting permit applications and blasting inspections are as established by the Cobb County Board of Commissioners, and as may be amended from time to time. (c) Escrow agreement. Prior to issuance of the blasting permit, the applicant may be required to deliver an executed escrow agreement, acceptable to the county attorney's office, and fully funded with cash in the amount of $50,000.00. (d) The fire marshal may prescribe any forms required for the administration of this article. ## History (Ord. of 2-27-07; Amd. of 2-24-15)