--- title: Cobb County Code of Ordinances, Sec. 50-106.1. Stormwater management standards collection: local-codes id: local-code:cobb-county/code/50-106.1 cite_as: Cobb County, Ga., Code of Ordinances § 50-106.1 canonical_url: https://georgiacommons.org/counties/cobb/code/50-106.1 md_url: https://georgiacommons.org/counties/cobb/code/50-106.1.md text_url: https://georgiacommons.org/counties/cobb/code/50-106.1/text source_url: https://library.municode.com/ga/cobb_county/codes/code_of_ordinances date: 2025-11-20 status: active jurisdiction: county:cobb jurisdiction_name: Cobb County county_fips: "13067" corpus_version: local-codes-cobb-county-24105329f0b5 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/cobb/code/~part-i/~chapter-50/~article-iv/~division-1.md previous: https://georgiacommons.org/counties/cobb/code/50-106.md next: https://georgiacommons.org/counties/cobb/code/50-107.md index: https://georgiacommons.org/counties/cobb.md branch: code edition: As published by Municode, current through 2025-11-20 edition_date_kind: current_through source_publisher: Municode version_id: local-code:cobb-county/code/50-106.1@2025-11-20-c987c9d4bc --- # Cobb County Code of Ordinances, Sec. 50-106.1. Stormwater management standards > As published by Municode, current through 2025-11-20 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article IV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 1 - GENERALLY Subject to the applicability criteria in section 50-105 and exemptions in section 50-106, the following stormwater management standards apply. Additional details for each standard can be found in the GSMM section 2.2.2.2: (a) Design of stormwater management system: The design of the stormwater management system shall be in accordance with the applicable sections of the GSMM and as well as the Cobb County Development Standards as directed by the administrator. Any design which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable. (b) Natural resources inventory: Site reconnaissance and surveying techniques shall be used to complete a thorough assessment of existing natural resources, both terrestrial and aquatic, found on the site. Resources to be identified, mapped, and shown on the stormwater management plan, shall include, at a minimum (as applicable): (i) Topography (minimum of two-foot contours) and steep slopes (i.e., areas with slopes greater than 15 percent), (ii) Natural drainage divides and patterns, (iii) Natural drainage features (e.g., swales, basins, depressional areas), (iv) Natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers, drinking water wellhead protection areas and river corridors, (v) Predominant soils (including erodible soils and karst areas), and (vi) Existing predominant vegetation including trees, high quality habitat and other existing vegetation. (c) Better site design practices for stormwater management: Stormwater management plans shall preserve the natural drainage and natural treatment systems and reduce the generation of additional stormwater runoff and pollutants to the maximum extent practicable. Additional details can be found in the GSMM section 2.3. (d) Stormwater runoff quality/reduction: Stormwater runoff quality/reduction shall be provided by using the following: (i) For development with a stormwater management plan submitted before December 31, 2020 the applicant may choose either (A) runoff reduction or (B) water quality. (ii) For development with a stormwater management plan submitted on or after December 31,2020, the applicant shall choose (A) runoff reduction and additional water quality shall not be required. To the extent (A) runoff reduction has been determined to be infeasible for all or a portion of the site using the practicability policy, then (B) water quality shall apply for the remaining runoff from a 1.2-inch rainfall event and must be treated to remove at least 80 percent of the calculated average annual postdevelopment total suspended solids (TSS) load or equivalent as defined in the GSMM. (A) Runoff reduction. The stormwater management system shall be designed to retain the first 1.0 inch of rainfall on the site using runoff reduction methods, to the maximum extent practicable. (B) Water quality. The stormwater management system shall be designed to remove at least 80 percent of the calculated average annual post-development total suspended solids (TSS) load or equivalent as defined in the GSMM for runoff from a 1.2-inch rainfall event. (iii) If a site is determined to be a hotspot as detailed in section 50-71, the county may require the use of specific or additional components for the stormwater management system to address pollutants of concern generated by that site. (e) Stream channel protection: Stream channel protection shall be provided by using all of the following three approaches: (A) 24-hour extended detention storage of the one-year, 24-hour return frequency storm event; (B) Erosion prevention measures, such as energy dissipation and velocity control; and (C) Preservation of any applicable stream buffer. (f) Overbank flood protection: Downstream overbank flood protection shall be provided by controlling the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour storm event. This requirement may be adjusted or waived by the manager for sites where the post-development downstream analysis shows that uncontrolled post- development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post- development conditions. (g) Extreme flood protection: Extreme flood protection shall be provided by controlling the 100-year, 24-hour storm event such that flooding is not exacerbated. This requirement may be adjusted or waived by the manager for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions. (h) Trout stream protection: Trout stream protection shall be provided by controlling temperature for receiving waters with trout stream designations. In streams designated as primary trout waters by the Wildlife Resources Division of the Department of Natural Resources, there shall be no elevation of natural stream temperatures. In streams designated as secondary trout waters, there shall be no elevation exceeding 2°F of natural stream temperatures. (i) Downstream analysis: Due to peak flow timing and runoff volume effects, some structural components of the stormwater management system may fail to reduce discharge peaks to pre-development levels downstream from the site. A downstream peak flow analysis shall be provided to the point in the watershed downstream of the site or the stormwater management system where the area of the site comprises ten percent of the total drainage area in accordance with section 3.1.9 of the GSMM. This is to help ensure that there are minimal downstream impacts from development on the site. The downstream analysis may result in the need to resize structural components of the stormwater management system. (j) Stormwater management system inspection and maintenance. The components of the stormwater management system that will be privately owned and maintained, including all drainage facilities, best management practices, credited conservation spaces, and conveyance systems, shall have an inspection and maintenance agreement to ensure that they continue to function as designed. All new development and redevelopment sites shall prepare a comprehensive inspection and maintenance agreement for the on-site stormwater management system. This agreement shall be written in accordance with the requirements in section 50-161.1. ## History (Amd. of 2-9-21; Amd. of 11-20-25) ## Meetings that refer to this section Found 1: meetings of this government whose minutes or machine transcripts name this section, or an ordinance in its history line, newest first. Found by rule from those records' own words. A reference is a pointer to another record, not a statement that the section applies or was changed. - 2025-11-12: [Cobb County Board of Commissioners regular meeting minutes, November 12, 2025](https://georgiacommons.org/counties/cobb/meetings/cobb-county-board-of-commissioners/2025-11-12.md) (minutes) refers to this section: "Sec. 50- 106. 1"