--- title: Cobb County Code of Ordinances, Sec. 50-126.1. Pre-submittal meeting collection: local-codes id: local-code:cobb-county/code/50-126.1 cite_as: Cobb County, Ga., Code of Ordinances ยง 50-126.1 canonical_url: https://georgiacommons.org/counties/cobb/code/50-126.1 md_url: https://georgiacommons.org/counties/cobb/code/50-126.1.md text_url: https://georgiacommons.org/counties/cobb/code/50-126.1/text source_url: https://library.municode.com/ga/cobb_county/codes/code_of_ordinances date: 2025-11-20 status: active jurisdiction: county:cobb jurisdiction_name: Cobb County county_fips: "13067" corpus_version: local-codes-cobb-county-24105329f0b5 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/cobb/code/~part-i/~chapter-50/~article-iv/~division-2.md previous: https://georgiacommons.org/counties/cobb/code/50-126.md next: https://georgiacommons.org/counties/cobb/code/50-127.md index: https://georgiacommons.org/counties/cobb.md branch: code edition: As published by Municode, current through 2025-11-20 edition_date_kind: current_through source_publisher: Municode version_id: local-code:cobb-county/code/50-126.1@2025-11-20-837deeec14 --- # Cobb County Code of Ordinances, Sec. 50-126.1. Pre-submittal meeting > As published by Municode, current through 2025-11-20 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article IV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 2 - STORMWATER CONCEPT AND DESIGN PLANS Before a land development permit application is submitted, an applicant may request a pre-submittal meeting with the Cobb County Water System Stormwater Management Division. The pre-submittal meeting should take place based on an early step in the development process such as before site analysis and inventory (GSMM section 2.4.2.4) or the stormwater concept plan (GSMM section 2.4.2.5). The purpose of the pre-submittal meeting is to discuss opportunities, constraints, and ideas for the stormwater management system before formal site design engineering. To the extent applicable, local and regional watershed plans, greenspace plans, trails and greenway plans, and other resource protection plans should be consulted in the pre-submittal meeting. Applicants must request a pre-submittal meeting with the Cobb County Water System Stormwater Management Division when applying for a determination of infeasibility through the practicability policy. ## History (Amd. of 2-9-21)