--- title: Cobb County Code of Ordinances, Sec. 50-158. Inspection requirements during construction collection: local-codes id: local-code:cobb-county/code/50-158 cite_as: Cobb County, Ga., Code of Ordinances § 50-158 canonical_url: https://georgiacommons.org/counties/cobb/code/50-158 md_url: https://georgiacommons.org/counties/cobb/code/50-158.md text_url: https://georgiacommons.org/counties/cobb/code/50-158/text source_url: https://library.municode.com/ga/cobb_county/codes/code_of_ordinances date: 2025-11-20 status: active jurisdiction: county:cobb jurisdiction_name: Cobb County county_fips: "13067" corpus_version: local-codes-cobb-county-24105329f0b5 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/cobb/code/~part-i/~chapter-50/~article-iv/~division-3.md previous: https://georgiacommons.org/counties/cobb/code/50-157.md next: https://georgiacommons.org/counties/cobb/code/50-159.md index: https://georgiacommons.org/counties/cobb.md branch: code edition: As published by Municode, current through 2025-11-20 edition_date_kind: current_through source_publisher: Municode version_id: local-code:cobb-county/code/50-158@2025-11-20-3591fa5ae1 --- # Cobb County Code of Ordinances, Sec. 50-158. Inspection requirements during construction > As published by Municode, current through 2025-11-20 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article IV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 3 - INSPECTION AND MAINTENANCE After commencing initial site operations, in addition to any inspections by the department, the permittee shall provide for regular inspections to be certified to the manager by a registered professional engineer at construction stages. Periodic inspections of the stormwater management system construction shall be conducted by the staff of the Cobb County Community Development or conducted and certified by a professional engineer who has been approved by the Cobb County Community Development. Construction inspections shall utilize the approved stormwater management plan for establishing compliance. All inspections shall be documented with written reports that contain the following information: (1) The date and location of the inspection; (2) Whether construction is in compliance with the approved stormwater management plan; (3) Variations from the approved construction specifications; and, (4) Any other variations or violations of the conditions of the approved stormwater management plan. If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions. ## History (Ord. of 9-28-93; Code 1977, § 3-22.5A-28; Ord. of 4-13-04; Amd. of 2-9-21)