Except as noted in this section, this article became effective on October 11, 1988: (1) Platted but vacant or unbuilt lots for which no building permit existed on October 11, 1988, are not exempt from the terms of this article. (2) Nothing contained in this section shall require any change in the plans, construction, size or designated use of a building, structure or part thereof, for which a building permit has been granted before October 11, 1988, and the construction of which, in conformity with such plans, shall have been undertaken within 180 days of such date. If any of the requirements stated in this subsection shall not have been fulfilled within the time stated herein, or if development operations are discontinued for a period of 90 days, any further construction shall be in conformity with the provisions of this article.