All public or community water utilities, including sewage shall be subject to local approval by the Board of Commissioners upon submission of appropriate plans and drawings. All such plans and drawings for water or sewer utilities shall be submitted with appropriate certification by a professional engineer along with documentation of preliminary or final approval from the State of Georgia Department of Natural Resources Environmental Protection Division, as required. If no approval from the Environmental Protection Division is required, then the applicant shall submit "as-built" drawings identifying the proposed placement of any utilities within or upon public rights-of-way, easements or properties.2