--- title: Coffee County Code of Ordinances, Sec. 5. Minimum requirements for purposes of obtaining an occupancy permit collection: local-codes id: local-code:coffee-county/code/5 cite_as: Coffee County, Ga., Code of Ordinances ยง 5 canonical_url: https://georgiacommons.org/counties/coffee/code/5 md_url: https://georgiacommons.org/counties/coffee/code/5.md text_url: https://georgiacommons.org/counties/coffee/code/5/text source_url: https://library.municode.com/ga/coffee_county/codes/code_of_ordinances date: 2024-10-07 status: active jurisdiction: county:coffee jurisdiction_name: Coffee County county_fips: "13069" corpus_version: local-codes-coffee-county-1303af0d3168 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/coffee/code/~part-ii/~chapter-66/~article-i.md previous: https://georgiacommons.org/counties/coffee/code/4.2.md next: https://georgiacommons.org/counties/coffee/code/6.md index: https://georgiacommons.org/counties/coffee.md branch: code edition: As published by Municode, current through 2024-10-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:coffee-county/code/5@2024-10-07-0f6a8d8b9c --- # Coffee County Code of Ordinances, Sec. 5. Minimum requirements for purposes of obtaining an occupancy permit > As published by Municode, current through 2024-10-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article I - MANUFACTURED HOMES The designated Coffee County Inspecting Official shall inspect all Manufactured Homes prior to residential occupancy. A previously inspected unit shall be required to be re-inspected on being moved to a new location within the county. Coffee County Code Enforcement shall be granted a final inspection to each home, after set-up, to verify facilities required. Inspections shall include: a. Proper setbacks. b. Sufficient off-street parking. c. Installation of an approved septic tank or an approved sewer system. d. Inspection of electrical wiring. e. Inspection of anchoring and tie-down installations. f. Inspection for proper utilities connections. g. Inspection for proper sewage connections. h. Adherence to all applicable Coffee County Codes. i. Reinspection of the required facilities to ensure that no change in condition or function occurred during transport. j. All Manufactured Homes that are located in Coffee County, and change ownership, but are not relocated must be inspected on site prior to issuance of occupancy permit. k. Individuals purchasing Manufactured Homes that require repairs must understand that if the home fails inspection, Coffee County will not issue an occupancy permit.