(a) Specifications of the location and depth of the connection of hydrants shall meet the standards contained in the specifications set out by the county. (b) After approval by the county, the developer shall stubs and lines with a cap for the future installation of fire hydrants. (c) All installations shall meet any applicable county, state, and/or federal requirements.