Skip to content
Georgia Commons
Menu

Colquitt County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 26 - ENVIRONMENT / Article IV - GROUNDWATER RECHARGE PROTECTION

Sec. 26-94. Criteria.

About this text

  • As published by Municode, current through 2025-02-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The following criteria pursuant to O.C.G.A.

12-2-18 shall apply in significant recharge areas as defined above:

(1) The department of natural resources shall not issue any permits for new sanitary landfills not having synthetic liners and leachate collection systems.

(2) The department of natural resources shall not issue any new permits for the land disposal of hazardous wastes.

(3) The department of natural resources shall require all new facilities permitted or to be permitted to treat, store, or dispose of hazardous waste to perform such operations on an impermeable pad having a spill and leak collection systems.

(4) New above-ground chemical or petroleum storage tanks, having a minimum volume of 660 gallons, shall have secondary containment for 110 percent of the volume of such tanks or 110 percent of the volume of

the largest tank in a cluster of tanks.

(Note: These figures are consistent with US EPA rules for oil pollution prevention, 40 CFR 112.1). Such tanks used for agricultural purposes are exempt, provided they comply with all Federal requirements.

(5) New agricultural waste impoundment sites shall be lined if they are within:

a. A high pollution susceptibility areas;

b. A medium pollution susceptibility area and exceed 15 acre-feet;

c. A low pollution susceptibility area and exceed 50 acre-feet.

(6) New homes served by septic tank/drain field systems shall be on lots having the following minimum size limitations as identified on Table MT-1 of the department of human resources' Manual for On-Site Sewage Management Systems

(hereinafter "DHR Table Mt-1"):

a. 150 percent of the subdivision minimum lot size of DHR Table MT-1 if they are within a high pollution susceptibility area; and

b. 125 percent of the subdivision minimum lot size of DHR Table MT-1 if they are within a medium pollution

susceptibility area.

c. 110 percent of the subdivision minimum lot size of DHR Table MT-1 if they are within a low pollution susceptibility area.

(7) New mobile home parks served by septic tank/drain field systems shall have lots or spaces having the following size limitation as identified on Table MT-2 of the department of human resources' Manual

for On-Site Sewage Management Systems (hereinafter "DHR Table MT-2"):

a. 150 percent of the subdivision minimum lot or space size of DHR Table MT-2 if they are within a high pollution susceptibility area;

b. 125 percent of the subdivision minimum lot or space size of DHR Table MT-2 if they are within a medium

pollution susceptibility area; and

c. 110 percent of the subdivision minimum lot or space size of DHR Table MT-2 if they are within a low pollution susceptibility area.

(8) No construction may proceed on a building or mobile home to be served by a septic tank unless the county health department first approves the proposed septic tank installation as meeting the requirements of the DHR manual and (0, (g), (h), and above.

(9) Lots of records on projects approved prior to the adoption of this article are hereby exempted from the requirements of these regulations.

(10) New facilities which handle hazardous materials, of types and in amounts determined by department of natural resources, shall perform their operations on impermeable surfaces having spill and leak collection systems, as prescribed by department of natural resources.

(11) The department of natural resources shall require conservative design in any new permits for the spray irrigation of wastewaters or the land spreading of wastewater sludge in areas having high pollution susceptibility. This shall be accomplished

by comparing the department's Criteria for Slow Rate Land Treatment (February, 1986 or latest edition) with amendments and other technical publications to site specific information submitted by a registered professional engineer for each project.

(12) Permanent storm water infiltration basins shall not be constructed in area having high pollution susceptibility.

(13) Exclusive of mining settling basins, new wastewater treatment basins shall have an impermeable liner in areas having high pollution susceptibility.

History

The history line the source prints at the end of the section.

(Ord. No. 99-4, § 4, 6-22-99)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:colquitt-county/code/26-94@2025-02-04-0c8d9333de

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Colquitt County Code of Ordinances, Sec. 26-94. Criteria | Georgia Commons