(a) Before any utilities are placed on any county roads the utility company shall furnish the county a drawing of the proposed construction and the county issue a permit to the utility company to do the work. (b) All utilities crossing the right-of-way shall be encased within the road bed structure and shall be placed three feet below the ditch bottom. Those running parallel with the right-of-way or roadway shall be placed in the outer five feet of the right-of-way at a minimum depth of 2½ feet.