(a) On-site sewage management system required. Where public or community sewage treatment systems are not available, the owner, lessee or agent thereof of every building, residence or property, designed, used or intended to be used for human occupancy or congregation, shall provide an approved on-site sewage management system sufficient for persons normally expected to use or frequent the building, residence or other property for two hours or more. Connection shall be made to a public or community sewage treatment system when such system is available within 200 feet of the property line, or available in a public right-of-way abutting the property. Where a public or community sewage treatment system is to be constructed, or an existing public or community sewer is to be used, the building sewer shall be installed so that it will insure gravity flow at a self-cleaning velocity throughout. (b) On-site sewage management system construction permit required. No person may begin the physical development of a lot or structure thereon, where an on-site sewage management system will be utilized, nor install a new on-site sewage management system without having first applied for and obtained from the county board of health, a construction permit for the installation. (1) Application for such construction permit shall be made in writing, on forms provided by the county board of health. The application shall include: a. N rune and address of the owner and the applicant, if other than the owner, location of property. b. Plans and specifications including location and design of the proposed onsite sewage management system. c. Nature of the facility to be served. d. Location of all water supplies, on or off the lot, which will bear upon the location of the on-site sewage management system. e. Number of bedrooms in the dwelling, or the number of persons to be served in other types of establishments, or other sewage flow or water usage data. f. Soil characteristics, including soil types and capabilities, frequency and evaluations of seasonal high groundwater tables, occurrence or rock, and other impervious strata. g. Signature of owner or agent applying for permit. (2) However, part of the information required for the application may be waived, provided the county board of health deems that information is available from previously submitted subdivision or mobile home park data, or from other sources, sufficient to make an adequate appraisal of the acceptability of the proposed lot for on-site sewage management system installation. (c) Requirements for on-site sewage management system construction permit issuance or denial. (1) On-site sewage management system construction permits for conventional septic tank systems shall be issued only after a site inspection by the county board of health shows favorable findings relative to percolation rates, soil characteristics, groundwater, rock, and any other factors which would affect the acceptability of the lot. For construction of conventional septic tank systems, the suitability of the lot must be demonstrated through acceptable soil characteristics and/or percolation rates of less than 90 minutes per inch; freedom from groundwater interference or other potential for contamination of groundwater by sewage; absence of impervious strata below the level of the absorption field and absence of undesirable topographic characteristics and other factors which singly, or in combination, affect the acceptability of the lot. Lot suitability and approval for other types of on-site sewage management systems is to be determined by criteria established by the department's manual. The county board of health may deny or revoke an on-site sewage management system construction permit upon finding the lot unsuitable or for failure of the applicant to comply with the provisions of these rules. Such denial shall be made in accordance with the provisions of the Georgia Health Code. On-site sewage management construction permits shall remain valid for not more than 12 months from the date of issue. (2) Issuance of a construction permit for an on-site management system, and subsequent approval of same by representatives of the county board of health shall not be construed as a guarantee that such systems will function satisfactorily for a given period of time; furthermore, such representatives do not, by any action taken in effecting compliance with these rules, assume any liability for damages which are caused, or which may be caused, by the malfunction of such system. (d) Inspections. No person may cover or use a new on-site sewage management system until final inspection has been made by the county board of health to determine compliance with the provisions of the construction permit issued under subsection (c) of this section, and written approval has been issued by the county board of health. (1) A copy of the final inspection of an on-site sewage management system shall be provided to the owner, builder, developer or agent, whichever is appropriate. (2) Any grading, filling, or other landscaping or construction activities on the lot subsequent to final inspection by the county board of health which may adversely affect the on-site sewage management system shall render the approval void. (e) Maintenance. (1) It is the property owner's responsibility to maintain and operate the on-site sewage management system in a safe and sanitary manner so as not to constitute a public health hazard or nuisance. (2) Where an on-site sewage management system is proposed to serve facilities under separate ownership, a contract to ensure proper operation and maintenance of the system, signed by all owners, shall exist as a precondition to the issuance of a permit for the construction of the on-site sewage management system. (f) Prohibited discharge. No person shall allow the unapproved discharge or spillage of sewage, nor shall an on-site sewage management system be used or maintained in such a manner that will allow the seepage or discharge of effluent from such system to the ground surface, to a watercourse, drainage ditch, open trench, canal, storm drain or storm sewer, water well, abandoned well, lake, stream, river, estuary, groundwater or other body of water. (g) Design limits on conventional septic ยท tank systems. To provide for the maintenance of sanitary conditions through the proper functioning of a conventional septic tank system for a reasonable period of time, no such system may be installed, constructed, or used, having a septic tank design capacity of less than 750 gallons or more than 10,000 gallons, or where the total length of absorption trenches required would exceed 3,000 linear feet, or where the total absorption trench bottom area required would exceed 9,000 square feet. (h) Submission of plans, specifications, and soil data. Plans, specifications, soil data and, if required, percolation test data, submitted to the county board of health for the purpose of obtaining a construction permit to install an on-site sewage management system to serve a commercial, industrial or institutional facility, which will produce a sewage flow in excess of 2,000 gallons per day, a travel trailer and/or mobile home park, or multiple family dwelling of five or more family units shall bear the registration number and signature of a registered professional engineer, certified and registered under the laws of this state. The county board of health may accept plans, specifications, soil data, and percolation test data for commercial, industrial, or institutional facilities with sewage flows of2,000 gallons or less per day and for single- and multiple-family dwellings having not more than four-family units, when prepared in accordance with these rules, from any person who demonstrates to the satisfaction of the county board of health that they have sufficient knowledge of on-site sewage management system design, soil evaluation, and of conducting percolation tests. (i) Soil data acceptability. Soil data deemed to be acceptable by the county board of health shall include information on soil characteristics obtained from published soil surveys and/or unpublished reports and field data developed by the Soil Conservation Service, United States Department of Agriculture, or from special investigations conducted by a soil scientist. (Co. Bd. Health Rule 290-5-26.03)