--- title: Colquitt County Code of Ordinances, Sec. 70-52. Absorption fields collection: local-codes id: local-code:colquitt-county/code/70-52 cite_as: Colquitt County, Ga., Code of Ordinances ยง 70-52 canonical_url: https://georgiacommons.org/counties/colquitt/code/70-52 md_url: https://georgiacommons.org/counties/colquitt/code/70-52.md text_url: https://georgiacommons.org/counties/colquitt/code/70-52/text source_url: https://library.municode.com/ga/colquitt_county/codes/code_of_ordinances date: 2025-02-04 status: active jurisdiction: county:colquitt jurisdiction_name: Colquitt County county_fips: "13071" corpus_version: local-codes-colquitt-county-a00c59d1d0ec publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/colquitt/code/~part-ii/~chapter-70/~article-ii/~division-2.md previous: https://georgiacommons.org/counties/colquitt/code/70-51.md next: https://georgiacommons.org/counties/colquitt/code/70-53.md index: https://georgiacommons.org/counties/colquitt.md branch: code edition: As published by Municode, current through 2025-02-04 edition_date_kind: current_through source_publisher: Municode version_id: local-code:colquitt-county/code/70-52@2025-02-04-12b06a7bc9 --- # Colquitt County Code of Ordinances, Sec. 70-52. Absorption fields > As published by Municode, current through 2025-02-04 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 70 - WATERAND SEWERS / Article II - COUNTY BOARD OF / Division 2 - ON-SITE SEWAGE MANAGEMENT SYSTEMS (a) Area computation. Absorption trench bottom area shall be based upon the anticipated volume of treated sewage and upon the characteristics of the soil in which absorption fields are to be located as specified in the current on-site sewage management system manual. Soil characteristics and other related data, including percolation tests, may be required by the county board of health. (b) Location. No absorption field shall be constructed less than 100 feet from existing or proposed wells or springs; less than ten feet from water supply lines; less than ten feet from building foundations and property lines; less than 15 feet frum an embankment nor less than 50 feet from the normal water level of any impoundment, tributary, stream, or other body of water. If it becomes necessary for the absorption field to be crossed by a water supply line, the water supply line within ten feet of the absorption field shall be at least 12 inches above the top of the aggregate layer of the absorption line and shall be encased in a single length of water pipe. No absorption field shall be installed in areas where groundwater, soil characteristics or adverse geological formation may interfere with the absorption of sewage effluent. (c) Minimum design and construction for conventional septic tank systems. Absorption lines and absorption trench bottoms shall be true to grade and trenches shall be not less than 25 inches in depth, and shall have not less than 12 inches of earth cover. Maximum length of absorption trench laterals for distribution box systems shall be 100 feet; laterals shall be equal in length and spaced not less than eight feet apart, center to center. Absorption trenches shall be not more than 36 inches wide. (d) Field layout methods for conventional septic tank systems. Absorption fields shall be planned and installed in accordance with one of the following methods: (1) Distribution box method. On level or sloping topography, the distribution box method may be used, and shall be required when dosing tanks are used. A firm earthen or concrete foundation for distribution boxes extending at least 12 inches beyond the walls of the box shall be provided to ensure against tilting of the distribution box. Extreme care should be exercised in backfilling around and over the distribution box. The top of the distribution box shall have a minimum earth cover of six inches but no more than 24 inches unless provisions are made for ready access to the distribution box. The sewer from the septic tank or dosing tank shall enter the distribution box and terminate inside the distribution box with an elbow turned downward to form a submerged outlet at normal water level, or a baffle may be used, providing the same function is accomplished. Absorption lines of equal lengths shall be connected to distribution box outlets by independent sewers. Absorption trenches may be installed at the same elevation or at different elevations, but all sewers leading from the distribution box outlet to the absorption lines shall be installed at the same elevation and shall be level for two feet and shall be sealed watertight. Beginning two feet from the distribution box, the grade of such sealed lines shall be not less than oneeighth inch per foot. Absorption lines shall be laid on a uniform grade of not less than two inches nor more than four inches per 100 feet with the minimum of two inches recommended. An increased number of shorter trenches is recommended rather than the use of fewer, longer trenches. (2) Level field method. On level or slightly sloping topography, the level field method may be used. When this method is used, the absorption field shall be installed level, with all absorption lines interconnected to form a continuous system. A standard tee fitting shall be used to interconnect the absorption lines. (3) Serial distribution method. On more severely sloping topography, the serial distribution method may be used. When this method is used, level absorption trenches shall be constructed along land contours. The sewer from the septic tank shall enter the uppermost absorption lines and termi- nate at any point in the line so that all sewage from the septic tank is discharged into the first line. Adjacent absorption lines shall be successively connected by means of overflow sewers constructed at any point along the line in such a manner that each trench is filled with effluent to the full depth of aggregate before the effluent flows through the overflow sewer to the next trench. The invert of the first overflow sewer must be at least four inches lower than the invert of the septic tank outlet. At the point where an overflow sewer leaves an absorption trench, the excavation for the overflow sewer shall be dug no deeper than the top of the aggregate in the absorption trench, so that an undisturbed block of earth will remain in place for the full depth of the aggregate. Overflow sewers connecting absorption trenches shall be laid on undisturbed earth. (Co. Bd. Health Rule 290-5-26.07)