Where sizing of the on-site sewage management system is determined by sewage flow, estimates of the daily sewage flow shall not be less than the volume derived from the population to be served. Daily sewage flow shall be determined from the department's current manual; however, the flow for establishments not listed shall be determined by the county board of health after due consideration of data submitted by the owner or his agent on design criteria. Calculations will be made on the basis of peak flow loads and not on longterm averages. (Co. Bd. Health Rule 290-5-26.13)