(a) Water supply. A public water supply shall be required if available within 1,000 feet of the proposed subdivision or mobile home park. (b) Percolation tests. Where required for planning purposes and determination of the general absorption capacity of soils, the number of percolation tests to be made shall be one per lot, in the area where absorption fields are to be located. Preparatory to construction of on-site sewage management systems, individual lots within the proposed development shall comply with section 70-48. (Co. Bd. Health Rule 290-5-26.15)