--- title: Columbia County Code of Ordinances, Sec. 18-305. Application and other requirements collection: local-codes id: local-code:columbia-county/code/18-305 cite_as: Columbia County, Ga., Code of Ordinances § 18-305 canonical_url: https://georgiacommons.org/counties/columbia/code/18-305 md_url: https://georgiacommons.org/counties/columbia/code/18-305.md text_url: https://georgiacommons.org/counties/columbia/code/18-305/text source_url: https://library.municode.com/ga/columbia_county/codes/code_of_ordinances date: 2026-02-17 status: active jurisdiction: county:columbia jurisdiction_name: Columbia County county_fips: "13073" corpus_version: local-codes-columbia-county-83d868dbd23f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/columbia/code/~part-ii/~chapter-18/~article-ix.md previous: https://georgiacommons.org/counties/columbia/code/18-304.md next: https://georgiacommons.org/counties/columbia/code/18-306.md index: https://georgiacommons.org/counties/columbia.md branch: code edition: As published by Municode, current through 2026-02-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:columbia-county/code/18-305@2026-02-17-239b6d8498 --- # Columbia County Code of Ordinances, Sec. 18-305. Application and other requirements > As published by Municode, current through 2026-02-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING CONSTRUCTION / Article IX - WIRELESS TELECOMMUNICATIONS FACILITIES (a) The application requirements and other requirements for proposed co-locations and modifications that meet the following requirements shall be entitled to streamlined processing as set forth in subsection (b) of this section: (1) The proposed co-location or modification shall not increase the overall height or width of the telecommunications tower to which the wireless telecommunications equipment is attached; (2) The proposed co-location or modification shall not increase the dimensions of the telecommunications site initially approved by the county; (3) The proposed co-location or modification shall comply with applicable conditions of approval applied to the initial wireless telecommunications equipment and telecommunications tower as well as any subsequently adopted amendments to such conditions of approval; and (4) The proposed co-location or modification shall not exceed the applicable weight limits for the wireless support structure, as demonstrated by a letter from a structural engineer licensed to practice in this state. (b) The application requirements and other requirements for co-locations and modifications entitled to streamlined processing under this chapter are as follows: (1) An application shall not be required for co-locations on towers existing prior to the adoption of this chapter, or co-locations on towers for which an application has already been approved under this chapter. (2) All applicants for wireless telecommunications facilities or any alteration of such facility shall comply with the requirements set forth in this chapter. The board of commissioners is the officially designated agency or body of the county to whom applications shall be made, and that is authorized to review, analyze, evaluate and make decisions with respect to approving or not approving, recertifying or not recertifying, or revoking applications for wireless telecommunications facilities. The planning commission shall accept, review, analyze, evaluate and make recommendations to the board of commissioners with respect to the approving or not approving, recertifying or not recertifying or revoking of applications for wireless telecommunications facilities. (3) An application shall be signed on behalf of the applicant by the person preparing the same, which person must be a duly authorized agent of the applicant with knowledge of the contents and representations made therein and attesting to the truth and completeness of the information. The landowner, if different than the applicant, shall also sign the application. At the discretion of the planning commission or the board of commissioners, any false or misleading statement in the application may subject the applicant to denial of the application without further consideration or opportunity for correction. (4) The applicant shall include a statement in writing: a. That the applicant's proposed wireless telecommunications facilities shall be maintained in a safe manner, and in compliance with all conditions of the application, without exception, unless specifically granted relief by the board of commissioners in writing, as well as all applicable and permissible local codes, ordinances, and regulations, including any and all applicable county, state and federal ordinances, rules, and regulations; b. That the construction, co-location, or modification of the wireless telecommunications facilities is legally permissible, including, but not limited to the fact that the applicant is authorized to do business in the State of Georgia. (5) No wireless telecommunications facilities shall be installed, modified, or constructed until the site plan is reviewed and approved by the board of commissioners, and the application has been approved as set forth in this chapter. (6) The application shall include, in addition to the other requirements as set forth in this subsection (subsection (b)), the following information: a. Name, address and phone number of the person preparing the report; b. Name, address, and phone number of the property owner, operator, and applicant, to include the legal form of the applicant; c. Street address and tax map parcel number of the property; d. Zoning district in which the property is situated; e. Size of the property stated both in square feet and lot line dimensions, and a diagram showing the location of all lot lines reflected on a survey; f. Location, size and height of all structures on the property which is the subject of the application; g. Location, size and height of all proposed and existing antennae and all appurtenant structures; h. Type, locations and dimensions of all proposed and existing landscaping, and fencing; i. The number, type and design of the telecommunications tower(s) antenna(s) proposed and the basis for the calculations of the telecommunications tower's capacity to accommodate multiple users; j. The make, model and manufacturer of the tower and antenna(s); k. The frequency, modulation and class of service of radio or other transmitting equipment; l. Transmission and maximum effective radiated power of the antenna(s); m. Direction of maximum lobes and associated radiation of the antenna(s); n. Applicant's proposed tower maintenance and inspection procedures and related system of records; o. Certification that NIER levels at the proposed site are within the threshold levels adopted by the FCC; p. Certification that the proposed antenna(s) will not cause interference with existing telecommunications devices, which certification shall be reviewed by a licensed engineer registered in the state. (7) After construction and prior to receiving a certificate of occupancy under Columbia County Code of Ordinances section 90- 178, the applicant shall furnish written certification that the wireless telecommunications facilities are grounded and bonded so as to protect persons and property and installed with appropriate surge protectors. (8) Any and all representations made by the applicant, on the record, during the application process, whether written or verbal, shall be deemed a part of the application and may be relied upon in good faith by the board of commissioners. (9) All utilities from wireless telecommunications facilities sites shall be installed underground and in compliance with all ordinances, rules and regulations of the county, including specifically, but not limited to, the National Electrical Safety Code and the National Electrical Code where appropriate. The board of commissioners may waive or vary the requirements of underground installation of utilities whenever, in the opinion of the board of commissioners, such variance or waiver shall not be detrimental to the health, safety, general welfare and environment including the visual and scenic characteristics of the area. (10) Both the wireless telecommunications facility and any and all accessory or associated facilities shall maximize use of building materials, colors and textures designed to blend with the structure to which it may be affixed and/or to harmonize with the natural surroundings. (11) A person who holds an approved application for wireless telecommunications facilities shall construct, operate, maintain, repair, provide for removal of, alter and/or restore the permitted wireless telecommunications facilities in strict compliance with all current technical, safety and safetyrelated codes adopted by the county, state, or United States, including but not limited to the most recent editions of the National Electrical Safety Code and the National Electrical Code, as well as accepted and responsible workmanlike industry practices and recommended practices of the National Association of Tower Erectors. The codes referred to are codes that include, but are not limited to, construction, building, electrical, fire, safety, health, and land use codes. In the event of a conflict between or among any of the preceding, the more stringent shall apply. (12) The holder of an application approved under this chapter shall obtain, at its own expense, all permits and licenses required by applicable rule, regulation or ordinance, and must maintain the same, in full force and effect, for as long as required by the county or other governmental entity or agency having jurisdiction over the applicant. (13) The holder of an approved application shall notify the county of any intended alteration of a wireless telecommunication facility and shall apply to the county to alter, relocate or rebuild a wireless telecommunications facility. (c) In addition to the requirements set forth in subsection (b) above, the application requirements and other requirements for wireless telecommunications facilities not entitled to streamlined processing under this section are as follows: (1) All new wireless telecommunication facilities requiring a new supporting tower to be erected shall use a monopole tower, unsupported by guy wires, unless waived by the board of commissioners. All applications for the construction or installation of new wireless telecommunications facilities shall be accompanied by a report containing the information hereinafter set forth. The report shall be signed by a licensed professional engineer registered in the state. Where this section calls for certification, such certification shall be by a licensed professional engineer registered in the state, acceptable to the county, unless otherwise noted. The application shall include the information set forth in subsection (b) above and, in addition to the other requirements contained in this chapter, the following information: a. For a new telecommunications tower, documentation that demonstrates the need for the wireless telecommunications facility to provide service primarily within the county and its police jurisdiction; b. Location of nearest residential structure and residential zoning district; c. Location of nearest habitable structure; d. Location of nearest school; e. Location of nearest public park; f. Location of any places where minor children are known to congregate within one mile; g. A description of the proposed tower and antenna(s) and all related fixtures, structures, appurtenances and apparatus, including height above pre-existing grade, materials, color and lighting; h. A copy of the FCC license applicable for the use of wireless telecommunications facilities; i. Certification that a topographic and geomorphologic study and analysis has been conducted, and that taking into account the subsurface and substrata, and the proposed drainage plan, that the site is adequate to assure the stability of the proposed wireless telecommunications facilities on the proposed site; j. Propagation studies of the proposed site and all adjoining proposed, inservice or existing sites; k. Applicant shall disclose in writing any agreement in existence prior to submission of the application that would limit or preclude the ability of the applicant to share any new telecommunications tower that it constructs; l. Certification and statement that appropriate space has been reserved on the tower for public safety usage at no cost to the public safety entity. The county will provide the specific requirements for such public safety usage, if any, after the pre-application meeting (see [subsection] (11), this heading). (2) In the case of a new telecommunications tower, the applicant shall be required to submit with the application a written report, together with copies of written requests and responses for shared use, demonstrating its efforts to secure shared use of existing telecommunications tower(s) or use of existing buildings or other structures within the county. (3) The applicant shall furnish written certification that the telecommunication facility, foundation and attachments are designed and will be constructed ("as built") to meet all local, county, state and federal structural requirements for loads, including wind and ice loads, as required by the currently adopted building code. (4) If requested by the board of commissioners, the applicant shall furnish a visual impact assessment which shall include: a. A zone of visibility map reflecting the visibility at the time of the application which shall be provided in order to determine locations where the tower may be seen; b. Pictorial representations of "before and after" views from key viewpoints both inside and outside of the county, including but not limited to state highways and other major roads; state and local parks; other public lands; historic districts; preserves and historic sites normally open to the public; and from any other location where the site is visible to a large number of visitors, travelers or residents. The board of commissioners, acting in consultation with its consultants or experts, may provide guidance concerning the appropriate key sites at a pre-application meeting (see [subsection] (11), this heading). c. An assessment of the visual impact of the tower base and accessory buildings from abutting and adjacent properties and streets. (5) All wireless telecommunications facilities applications shall contain an adequate demonstration that the facility be sited so as to have the least adverse visual effect on the environment and its character, and the residences in the area of the wireless telecommunications facilities sites, including but not limited to a landscaping plan; (6) At a telecommunications site, an access road and parking shall be provided to assure adequate emergency and service access. Maximum use of existing roads, whether public or private, shall be made to the extent practicable. Road construction shall at all times minimize ground disturbance and vegetation-cutting. Road grades shall closely follow natural contours to assure minimal visual disturbance and reduce soil erosion. (7) The county may require at the applicant's expense an environmental review of the proposed project in combination with its review of the application under this chapter. (8) An applicant shall submit to the planning commission the number of copies of the completed applications determined to be needed at the pre-application meeting (see [subsection] (11), this heading). (9) The applicant shall include an examination of the feasibility of designing a proposed telecommunications tower to accommodate future demand for at least two additional commercial uses including future co-locations. The telecommunications tower shall be structurally designed to accommodate at least two additional antenna arrays equal to those of the applicant, and located as close to the applicant's antenna as possible without causing interference. This requirement may be waived, provided that the applicant, in writing, demonstrates to the satisfaction of the board of commissioners that the provision of future shared usage of the telecommunications tower is not technologically feasible, or is commercially impracticable and creates an unnecessary and unreasonable burden, based upon: a. The foreseeable number of FCC licenses available for the area; b. The nature of the wireless telecommunications facilities site and structure proposed which cannot feasibly be adapted to shared use; c. The number of existing and potential licenses without wireless telecommunications facilities spaces/ sites; d. Available space on existing and approved telecommunications towers. (10) The application shall include a letter of intent to the planning commission and to the board of commissioners committing the owner of the proposed new tower, and his/her successors in interest, to negotiate in good faith for shared use of the proposed tower by other telecommunications providers in the future. Failure to abide by the conditions outlined in the letter may be grounds for revocation of the application. The letter shall commit the new tower owner and their successors in interest to: a. Respond within 60 days to a request for information from a potential shared-use applicant; b. Negotiate in good faith concerning future requests for shared use of the new tower by other telecommunications providers; c. Allow shared use of the new tower if another telecommunications provider agrees in writing to pay reasonable charges. The charges may include, but are not limited to, a pro-rata share of the cost of site selection, planning, project administration, land costs, site design, construction and maintenance financing, return on equity, less depreciation, and all of the costs of adapting the tower or equipment to accommodate a shared user without causing electromagnetic interference. (11) Unless waived by the county, there shall be a pre-application meeting before the planning commission's and/or the board of commissioner's consultants. Such preapplication meeting shall occur prior to the public hearing (section 18-315). The purpose of the pre-application meeting will be to address issues which will help to expedite the review and permitting process. A pre-application meeting may also include a site visit if required. Where the application is for the shared use of an existing telecommunications tower(s) or other high structure, the applicant should seek to waive any section or subsection of this chapter that may not be required. Following the pre-application meeting, the waiver requests, if appropriate, will be decided by the board of commissioners. Costs of the board of commissioner's and/or the planning commission's consultants to prepare for and attend the pre-application meeting will be borne by the applicant. (12) In order to better inform the public; in the case of a new telecommunications tower, the applicant shall prior to the public hearing (section 18-315) on the application, hold a "balloon test" as follows: Applicant shall arrange to fly, or raise upon a temporary mast, a minimum of a threefoot diameter brightly colored balloon at the maximum height of the proposed new tower twice. The dates, times and location of this balloon test shall be advertised, by the applicant, in each of the two weeks preceding in the newspaper which is the official organ of the county. The applicant shall inform the board of commissioners and the planning commission, in writing, of the dates and times of the tests, at least 14 days in advance. The balloon shall be flown for at least eight consecutive hours sometime between 7:00 a.m. and 4:00 p.m. of the dates chosen. The primary date shall be on a weekend, but the second date may be on a weekday. (13) The application shall include an analysis, completed by a qualified individual or organization, to determine if the telecommunications tower, and/or existing structure intended to support wireless facilities, requires lighting under Federal Aviation Regulation Part 77. This requirement shall be for any new tower or for an existing structure or building where the proposed wireless telecommunications facility increases the height of the structure or building. If this analysis determines that the FAA must be contacted, then all filings with the FAA, all responses from the FAA and any related correspondence shall be provided in a timely manner. The board of commissioners and the planning commission shall be provided copies of all such filings, responses, and related correspondence. ## History (Ord. No. 14-21, § 1(Exh. A), 12-2-2014)