--- title: Columbia County Code of Ordinances, Sec. 18-362. Permits and fees collection: local-codes id: local-code:columbia-county/code/18-362 cite_as: Columbia County, Ga., Code of Ordinances § 18-362 canonical_url: https://georgiacommons.org/counties/columbia/code/18-362 md_url: https://georgiacommons.org/counties/columbia/code/18-362.md text_url: https://georgiacommons.org/counties/columbia/code/18-362/text source_url: https://library.municode.com/ga/columbia_county/codes/code_of_ordinances date: 2026-02-17 status: active jurisdiction: county:columbia jurisdiction_name: Columbia County county_fips: "13073" corpus_version: local-codes-columbia-county-83d868dbd23f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/columbia/code/~part-ii/~chapter-18/~article-x.md previous: https://georgiacommons.org/counties/columbia/code/18-361.md next: https://georgiacommons.org/counties/columbia/code/18-363.md index: https://georgiacommons.org/counties/columbia.md branch: code edition: As published by Municode, current through 2026-02-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:columbia-county/code/18-362@2026-02-17-1e8cc82518 --- # Columbia County Code of Ordinances, Sec. 18-362. Permits and fees > As published by Municode, current through 2026-02-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING CONSTRUCTION / Article X - WIRELESS INFRASTRUCTURE RIGHT-OF-WAY (a) A permit is required to collocate a small wireless facility in the public right-of-way or to install, modify, or replace a pole or a decorative pole in the public right-of-way. A permit is not required to perform the activities described in O.C.G.A. § 36-66C-6(e) or (f). An applicant granted a permit under this article shall be required to obtain permits for additional activities such as electrical work, excavation, or closure of sidewalks vehicular lanes within the right-of-way if otherwise required by generally applicable law. (b) Any person seeking to collocate a small wireless facility in the public right-of-way or to install, modify, or replace a pole or a decorative pole in the public right-of-way shall submit an application to building standards department for a permit. Applications are available from the building standards department. Any material change to information contained in an application shall be submitted in writing to the building standards department within 30 days after the events necessitating the change. (c) Each application for a permit shall include the maximum application fees permitted under O.C.G.A. § 36-66C-5(a)(1), (a)(2) and (a)(3). Such maximum application fees and rates shall automatically increase on January 1 of each year beginning January 1, 2021, as provided under O.C.G.A. § 36-66C-5(b). (d) The building standards department shall review applications for permits according to the timelines and using the procedures identified in O.C.G.A. §§ 36-66C-7 and 36-66C-13. ## History (Ord. No. 19-14, § 1(Exh. A), 10-1-2019)