(a) The director may allow stormwater runoff that otherwise is of unacceptable quality, or which would be discharged in volumes or at rates in excess of those otherwise allowed by this division, to be discharged into drainage facilities off the site of the development, provided the applicant has demonstrated: (1) Off-site drainage facilities and channels leading to them are designed, constructed and maintained in accordance with requirements of this division; (2) Adequate provision is made for the sharing of construction, maintenance and operating costs of the facilities. The developer may be required to pay a portion of the cost of constructing facilities as a condition to receiving approval of the stormwater management plan; (3) It is not feasible to completely manage runoff on-site in a manner that meets the design and performance standards found in the county stormwater management design manual; and (4) The discharge is not in violation of any other local, state or federal rules or regulations. (b) A request to use off-site drainage facilities, and all information related to such proposed off-site facilities, should be made a part of the developer's stormwater management plan. Guidelines for consideration of off-site facility use will be defined in the county stormwater management design manual.