(a) General provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the ordinance and the state general permit are not met. Therefore, plans for land-disturbing activities required by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices which conform to the minimum requirements of this section. The application of measures and practices shall apply to all features of the project site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any landdisturbing activity in accordance with the requirements of this article and the NPDES general permit. (b) Minimum requirements/monitoring requirements. (1) Best management practices (BMPs) as set forth in this section shall be required for all land-disturbing activities. Proper design, installation, and maintenance of BMPs shall constitute a complete defense to any enforcement action or to any other allegation of noncompliance with subsection (c)(2) of this section. As used in this subsection the terms proper design and properly designed mean designed in accordance with the hydraulic design specifications contained in the E&S manual. (2) Monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities may occur shall be performed in accordance with the state general permit(s) applicable to the project. The turbidity of the receiving waters shall be measured in accordance with guidelines issued by the EPD director. (c) Violations. (1) A discharge of stormwater runoff from disturbed areas where BMPs have not been properly designed, installed, and maintained shall constitute a separate violation of this article for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units (NTUs). This subsection shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction project is equal to or greater than five acres. (2) Failure to properly design, install, or maintain BMPs where required under this article shall constitute a separate violation of this article for each day on which such failure occurs or continues. (3) Failure to perform turbidity monitoring or to submit monitoring results as required under the state general permit(s) applicable to the project shall be a violation of this article for each day on which such failure occurs or continues. (4) If any person commences any landdisturbing activity requiring a landdisturbing permit as prescribed in this article without first obtaining said permit, the person shall be in violation of this article for each day on which such land disturbing activity occurs or continues. (5) Conducting land-disturbing activity in any manner prohibited by or inconsistent with the requirements of this article shall constitute a separate violation of this article for each day on which such prohibited or inconsistent activity occurs or continues. (d) BMPs. Any party engaging in landdisturbing activities governed by this article shall employ protections at least as stringent as the state general permit(s) applicable to the project and, as a minimum, the BMPs, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the E&S manual, as well as the following: (1) Stripping of vegetation, re-grading and other development activities shall be conducted in a manner so as to minimize erosion; (2) Cut-fill operations must be kept to a minimum; (3) Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential; (4) Whenever feasible, natural vegetation shall be retained, protected and supplemented; (5) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum; (6) Disturbed soil shall be stabilized as quickly as practicable; (7) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development; (8) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable; (9) To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condi-tion of continuous compliance with the requirements of O.C.G.A. § 12-7-1 et seq.; (10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills; (11) Cuts and fills may not endanger adjoining property; (12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners; (13) Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum; (14) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in subsection (c)(1). (e) Construction waste. Wastes such as discarded construction materials, concrete truck washout, chemicals, litter, sanitary waste, and any other similar material which may cause adverse water quality impact must be controlled at the construction site, and transported to an appropriate disposal facility for such waste. Onsite burial of such wastes is not allowed. (f) Buffers. Except as provided in O.C.G.A. § 12-7-6(b)(16) for trout streams, O.C.G.A. § 12- 7-6(b)(17) for coastal marshlands, and section 34-69(f)(3), there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where (i) the EPD director determines to allow a variance, (ii) where otherwise allowed by the EPD director pursuant to O.C.G.A. § 12-2-8, (iii) where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or (iv) along any ephemeral stream. The county shall make the determination whether a stream is an ephemeral stream. Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the Georgia Water Quality Control Act, shall remain in force unless a variance is granted by the EPD director as provided in this paragraph. The following requirements shall apply to any such buffer: (1) No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction project site are completed. Once the final stabilization of the project site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; thinning of buffer shall be performed by hand, as heavy equipment may not be utilized within the buffer area; and (2) This buffer requirement shall not apply to the following land-disturbing activities, provided that such activities occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (a) stream crossings for water lines; or (b) stream crossings for sewer lines. (3) Savannah River Corridor Buffer. The Savannah River, bounding the county between Clarks Hill Dam on the north and the county line on the south, is recognized as a natural and cultural resource requiring conservation under section O.C.G.A. § 12-2-8, as amended. In order to preserve the quality of the Savannah River's water, its viability as an animal habitat and important recreation resource to the region, a natural vegetative buffer is established as follows: a. The buffer shall include all lands within 100 feet of the Savannah River, inclusive of any islands, as measured horizontally from the river bank. No land or vegetation shall be disturbed by building construction, development activity or for any other purpose, except for the following permitted uses: 1. Land uses existing prior to the adoption of the ordinance from which this chapter [article] is derived. 2. Single-family dwellings, provided that: (i) Each dwelling shall be located on a lot having an area of at least two acres, not including any area that lies within the Savannah River Buffer. (ii) No septic tank drainfield may be located within the Savannah River Buffer. 3. Timber production and harvesting. 4. Wildlife and fisheries management activities. 5. Public road and utility crossings. 6. Public forestry-oriented or water-dependent recreation uses, such as a boat ramp or forest interpretation. b. The natural vegetative buffer shall be restored as quickly as possible following any land disturbing activity within the Savannah River Buffer. (Ord. No. 16-16, § 1(Exh. A), 6-7-2016; Ord. No. 18-02, § 1(Exh. A), 2-6-2018; Ord. No. 18-13, § 1(Exh. A), 12-4-2018)