--- title: Columbia County Code of Ordinances, Sec. 34-73. Education and certification collection: local-codes id: local-code:columbia-county/code/34-73 cite_as: Columbia County, Ga., Code of Ordinances § 34-73 canonical_url: https://georgiacommons.org/counties/columbia/code/34-73 md_url: https://georgiacommons.org/counties/columbia/code/34-73.md text_url: https://georgiacommons.org/counties/columbia/code/34-73/text source_url: https://library.municode.com/ga/columbia_county/codes/code_of_ordinances date: 2026-02-17 status: active jurisdiction: county:columbia jurisdiction_name: Columbia County county_fips: "13073" corpus_version: local-codes-columbia-county-83d868dbd23f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/columbia/code/~part-ii/~chapter-34/~article-iii.md previous: https://georgiacommons.org/counties/columbia/code/34-72.md next: https://georgiacommons.org/counties/columbia/code/34-74.md index: https://georgiacommons.org/counties/columbia.md branch: code edition: As published by Municode, current through 2026-02-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:columbia-county/code/34-73@2026-02-17-98282d6edc --- # Columbia County Code of Ordinances, Sec. 34-73. Education and certification > As published by Municode, current through 2026-02-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 34 - ENVIRONMENT / Article III - SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL (a) All persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the SWC commission in accordance with O.C.G.A. § 12-7-19 and in consultation with the EPD and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20. (b) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on site whenever landdisturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit. (c) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this article. (d) If a permittee under the state general permit who has operational control of landdisturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7- 19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A § 12-7-19(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said paragraph. (Ord. No. 16-16, § 1(Exh. A), 6-7-2016; Ord. No. 18-02, § 1(Exh. A), 2-6-2018; Ord. No. 18-13, § 1(Exh. A), 12-4-2018)