(a) Application for a land disturbance permit shall be made to the administrator prior to beginning of any alteration, modification, change, grading or other development activities of any improved or unimproved real estate, which shall include the following: (1) Plans in duplicate drawn to scale showing elevations of the area in question and the nature, location, dimensions of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities. (2) A description of the extent to which any watercourse is proposed to be altered or relocated as a result of the proposed development. (3) A certification by a registered land surveyor, professional engineer or architect of the elevation in relation to mean sea level (or highest adjacent grade) of the proposed lowest floor, including basement, of all proposed structures. (4) Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed. (5) Design certification from a registered professional engineer or architect that any proposed nonresidential floodproofed structure will meet the floodproofing criteria in subsection 42-4(b)(2). (b) For all new construction and substantial improvements, the permit holder shall provide to the administrator an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. (c) Any work undertaken prior to submission of the certification shall be at the permit holder's risk. The county shall review the elevation certificate survey data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or to make such required corrections shall be cause to issue a stop work order for the project. (Ord. No. 14-05, § 1(Exh. A), 2-18-2014; Ord. No. 19-02, § 1(Exh. A), 3-5-2019)