--- title: Columbia County Code of Ordinances, Sec. 54-57. Water supply system collection: local-codes id: local-code:columbia-county/code/54-57 cite_as: Columbia County, Ga., Code of Ordinances § 54-57 canonical_url: https://georgiacommons.org/counties/columbia/code/54-57 md_url: https://georgiacommons.org/counties/columbia/code/54-57.md text_url: https://georgiacommons.org/counties/columbia/code/54-57/text source_url: https://library.municode.com/ga/columbia_county/codes/code_of_ordinances date: 2026-02-17 status: active jurisdiction: county:columbia jurisdiction_name: Columbia County county_fips: "13073" corpus_version: local-codes-columbia-county-83d868dbd23f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/columbia/code/~part-ii/~chapter-54/~article-ii.md previous: https://georgiacommons.org/counties/columbia/code/54-56.md next: https://georgiacommons.org/counties/columbia/code/54-58.md index: https://georgiacommons.org/counties/columbia.md branch: code edition: As published by Municode, current through 2026-02-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:columbia-county/code/54-57@2026-02-17-62a365a086 --- # Columbia County Code of Ordinances, Sec. 54-57. Water supply system > As published by Municode, current through 2026-02-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 54 - MOBILE HOMES AND TRAILERS / Article II - MOBILE HOME PARKS Every mobile home park shall provide an accessible, adequate potable water supply. The following requirements shall apply to the park's water system: (1) The design and size of the water system shall be based on the maximum number of mobile home spaces to be contained in the mobile home park. (2) The location, design and construction of a mobile home park's water supply and distribution system requires the approval of the county engineer and the health officer. Written approval of the water system by the county engineer and the health officer shall be required before a building permit will be issued. ## History (Ord. No. 19-08, § 1(Exh. A), 8-6-2019)