--- title: Columbia County Code of Ordinances, Sec. 86-127. Private septic tank systems collection: local-codes id: local-code:columbia-county/code/86-127 cite_as: Columbia County, Ga., Code of Ordinances § 86-127 canonical_url: https://georgiacommons.org/counties/columbia/code/86-127 md_url: https://georgiacommons.org/counties/columbia/code/86-127.md text_url: https://georgiacommons.org/counties/columbia/code/86-127/text source_url: https://library.municode.com/ga/columbia_county/codes/code_of_ordinances date: 2026-02-17 status: active jurisdiction: county:columbia jurisdiction_name: Columbia County county_fips: "13073" corpus_version: local-codes-columbia-county-83d868dbd23f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/columbia/code/~part-ii/~chapter-86/~article-iv.md previous: https://georgiacommons.org/counties/columbia/code/86-126.md next: https://georgiacommons.org/counties/columbia/code/86-128.md index: https://georgiacommons.org/counties/columbia.md branch: code edition: As published by Municode, current through 2026-02-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:columbia-county/code/86-127@2026-02-17-604ddb2198 --- # Columbia County Code of Ordinances, Sec. 86-127. Private septic tank systems > As published by Municode, current through 2026-02-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 86 - WATER AND SEWERS / Article IV - SEWER USE (a) Where the public sewer system is not available, the building sewer shall be connected to a private septic tank system complying with the provisions of this article. (b) Before commencement of construction of a private septic tank system, the owner shall first obtain a written permit signed by the county board of health. The application for such permit shall be made on a form furnished by the board of health, which the applicant shall supplement by any plans, specifications and other information deemed necessary by the county engineer or board of health. (c) A permit for a private septic tank system shall not become effective until the installation of the private septic tank system is completed to the satisfaction of the board of health. The board of health shall be allowed to inspect the work at any stage of construction and the applicant for the permit shall notify the board of health when the work is ready for final inspection and before any underground portions of the private septic tank system are covered, excluding the building sewer to the private septic tank system. (d) The type, capacities, location and layout of a private septic tank system shall comply with all recommendations of the state department of public health, and shall comply with the provisions of this article. No private septic tank or cesspool shall be permitted to discharge to any natural outlet. (e) At the time that a public sewer system becomes available to a property served by a private septic tank system, as provided in subsection 86-124(c), a notification to connect to the public sewer system may be made by the director. A direct connection shall be made to the public sewer system in compliance with this article within 30 days of such notification. If connection is made to the POTW, the private septic tanks shall be abandoned and filled with suitable material. ## History (Code 1979, § 2-7-36)