Skip to content
Georgia Commons
Menu

Columbia County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 86 - WATER AND SEWERS / Article IV - SEWER USE

Sec. 86-131. Hauled wastewater.

About this text

  • As published by Municode, current through 2026-02-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Septic tank waste may be introduced into the POTW only at locations designated by the director, and at such times as are established by the director. The director may require septic tank waste haulers to obtain wastewater discharge permits.

(b) A waste hauler shall:

(1) Discharge septic tank waste loads at times and locations specifically designated by the director.

(2) Be limited to discharging only domestic wastes.

(3) Purchase a waste hauler discharge ticket from the county water and sewer services division using a form and paying a price as set forth in the schedule of fees and charges on file in the office of the county clerk which shall be determined by the board of commissioners. The ticket must be presented to the operator prior to any discharge.

(4) Provide prior notice to the director of the intent to discharge, and the actual discharge must be performed under the supervision of plant personnel.

(5) Be prohibited from discharging any waste which would violate federal, state or local regulations.

(6) If required by the director, provide a completed waste manifest form which shall contain information regarding the waste

and the signature of each waste generator. The hauler shall also sign the form indicating that he has accepted no wastes

other than those listed on such form.

(7) If required by the director, provide a waste analysis of any load prior to discharge.

The director may collect samples of each hauled load to ensure compliance with applicable standards.

(8) Carry liability insurance in such amounts and in the form as determined by the board of commissioners, and provide satisfactory evidence of such insurance coverage to the county. Such insurance shall afford compensation for taking corrective

action, bodily injury and property damage to third persons caused by hauler negligence and/or accidents.

(c) The director shall require haulers of industrial waste to obtain wastewater discharge permits. The director may require generators of hauled industrial waste to obtain wastewater

discharge permits. The director may also prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements set forth in this article.

History

The history line the source prints at the end of the section.

(Code 1979, § 2-7-40)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbia-county/code/86-131@2026-02-17-99c35947cc

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbia County Code of Ordinances, Sec. 86-131. Hauled wastewater | Georgia Commons