--- title: Columbia County Code of Ordinances, Sec. 86-147. Contents of wastewater discharge permit application collection: local-codes id: local-code:columbia-county/code/86-147 cite_as: Columbia County, Ga., Code of Ordinances § 86-147 canonical_url: https://georgiacommons.org/counties/columbia/code/86-147 md_url: https://georgiacommons.org/counties/columbia/code/86-147.md text_url: https://georgiacommons.org/counties/columbia/code/86-147/text source_url: https://library.municode.com/ga/columbia_county/codes/code_of_ordinances date: 2026-02-17 status: active jurisdiction: county:columbia jurisdiction_name: Columbia County county_fips: "13073" corpus_version: local-codes-columbia-county-83d868dbd23f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/columbia/code/~part-ii/~chapter-86/~article-iv.md previous: https://georgiacommons.org/counties/columbia/code/86-146.md next: https://georgiacommons.org/counties/columbia/code/86-148.md index: https://georgiacommons.org/counties/columbia.md branch: code edition: As published by Municode, current through 2026-02-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:columbia-county/code/86-147@2026-02-17-4ae43fff2a --- # Columbia County Code of Ordinances, Sec. 86-147. Contents of wastewater discharge permit application > As published by Municode, current through 2026-02-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 86 - WATER AND SEWERS / Article IV - SEWER USE (a) All users required to obtain a wastewater discharge permit must submit a permit application. The director may require all users to submit as part of such application the following information: (1) A description of activities, facilities and plant processes on the premises, including a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; (2) The number and type of employees and the proposed or actual hours of operation; (3) Each product produced by type, amount, process and rate of production; (4) Type and amount of raw materials processed, average and maximum per day; (5) Site plans, floor plans, mechanical and plumbing plans, details showing all sewers, floor drains and appurtenances by size, location and elevation, and all points of discharge; (6) Time and duration of discharges; and (7) Any other information deemed necessary by the director to evaluate the wastewater discharge permit application. (b) All industrial users shall submit the report as set forth in section 86-153. (c) Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. (d) Engineering reports, plans, specifications and other materials submitted as part of a wastewater discharge permit shall be prepared by or under the direct supervision or review of, and bear the seal of, a professional engineer, competent in the field of sewage and industrial waste treatment. ## History (Code 1979, § 2-7-56)