Skip to content
Georgia Commons
Menu

Columbia County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 86 - WATER AND SEWERS / Article IV - SEWER USE

Sec. 86-150. Pretreatment facilities.

About this text

  • As published by Municode, current through 2026-02-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Users shall provide wastewater pretreatment, as necessary, to comply with this article, and shall achieve compliance with all categorical pretreatment standards, local limits and the prohibitions set forth in section 86-133 within the time limitations specified by the EPA, the state or the director, whichever is more stringent. Any facilities necessary for compliance with such standards

shall be provided, operated and maintained at the user's expense. Detailed plans describing such facilities and operating procedures shall be submitted to the director for review, and shall be acceptable to the director before such facilities are constructed. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying such facilities, as necessary, to produce a discharge acceptable to the county under the provisions of this article.

History

The history line the source prints at the end of the section.

(Code 1979, § 2-7-59)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbia-county/code/86-150@2026-02-17-90426a2b94

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbia County Code of Ordinances, Sec. 86-150. Pretreatment facilities | Georgia Commons