(a) Each user must notify the director of any planned significant changes to the user's operations or system, at least 60 days before the change, which might alter the nature, quality or volume of its wastewater. (1) The director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application as set forth in section 86-147; (2) The director may issue a wastewater discharge permit as set forth in section 86- 149, or modify an existing wastewater discharge permit as set forth in section 86-144 in response to changed conditions or anticipated changed conditions; and (3) For purposes of this section, significant changes include, but are not limited to, flow increases of 20 percent or greater, and the discharge of any previously unreported pollutants. (b) The director shall deny or condition new or increased contributions of pollutants to the POTW by industrial users where such contributions do not meet applicable pretreatment standards and requirements, or where such contributions would cause the county to violate its NPDES permit.